Site work for a bridge / tunnel in Eldred Township, Pennsylvania. Working plans call for site work for a bridge / tunnel.

As of May 7, 2025, meeting, the Supervisors voted to Reject and Rebid this project. No definite date yet for rebid Questions and inquiries should be addressed through Online. Questions Due Date: Apr 22nd 2025, 5:00 PM EDT Each bid must be accompanied by Bid Security made payable to "Ross Township" in an amount of ten percent (10%) of the total Bid price and in the form of a certified or bank check or a Bid Bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. The successful bidder must furnish Performance, Payment Bonds and Insurance per Contract and must meet the requirements of Paragraph 6.01 of General Conditions. This project is subject to minimum wage rates in accordance with the applicable provisions of the Pennsylvania Prevailing Wage Act and the Public Works Employee Verification Act. Ross Township reserves the right to waive any informality in, and/or to reject, any or all bids. No bid will be accepted if obtained from sources other than the issuing office noted above. The proposed work involves the installation of an Aluminum Box Culvert (including aluminum end walls, aluminum invert plates, and aluminum toe walls) along with the restoration of the stream channel adjacent to the proposed culvert. Ross Township will purchase and assemble (on site) the Aluminum Box Culvert (including aluminum end walls, aluminum invert plates, and aluminum toe walls) via Costars prior to the start of construction. All site construction, installation, and restoration work associated with this project will be included within this bid package. This work shall include: all excavation work, aluminum box culvert installation work, stream bed restoration work, all paved roadway restoration work, shoulder restoration, installation of guide rails, all necessary erosion and sediment controls, and related work in accordance with the Contract Documents and Specifications. It is anticipated that work will commence in or around May 19, 2025, and all work within the stream and associated with this grant project must be completed by August 15, 2025. All remaining site improvements must be completed by September 30, 2025. It should also be noted that no work can be performed in the stream from October 1st to December 31st per the General Permit Conditions. The Engineer's Estimate is $75,000.00. Project has been cancelled

Final Planning

Bridges / Tunnels

$124,455.00

Public - County

Site Work

23

14

3

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
818
Active Projects
377
Bidding Soon
5,683
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2025

November 19, 2025

Project location map

Mount Eaton Road, Eldred Township, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.