Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 30, 2025 at 8:00 PM

Updated May 31, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Abingdon, Virginia. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

District: Bristol ORDER NO.: M65 Proposal ID: C0000126627B01 CNSP (F) 1-9-06 Route Number 1212 County City Washington Description Bridge Replacement Construction Begin Site 0.04 Mi. From Rte 58 Construction End Site 1.0 Mi. From Rte 91 Time Limit 7/1/2027 Last Date to Post Questions: 5/23/2025 VDOT - M65 - Bridge Replacement - Route 1212 QA - 5/26/25

Bid Results

Bridges / Tunnels

$3,452,064.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

44

10

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
66
Bidding Soon
995
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2025

July 28, 2025

Project location map

Route 1212, Abingdon, VA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed