Site work for a water / sewer project in Edmond, Oklahoma. Conceptual plans call for site work for a water / sewer project.
Deer Creek Wastewater Treatment Plant Expansion A&E Reference Number 0000382709 Question Acceptance Deadline 04/21/2025 11:00 AM EDT Questions are submitted online Yes The Oklahoma City Water Utilities Trust (OCWUT) is evaluating all requirements to expand capacity at the Deer Creek Wastewater Treatment Plant (WWTP) from 15 million gallons per day (MGD) to 20 MGD. The Engineer will provide all preliminary engineering services required to develop an expansion plan for the Deer Creek WWTP. Final design, bidding, construction administration and management, inspection, and as-built services may be completed under a future amendment OCWUT funds, operates, and maintains the Deer Creek WWTP to provide wastewater services to its citizens and wholes ale customers. The Deer Creek WWTP is an activated sludge treatment plant located in the northwest part of Oklahoma City. This study will determine all requirements associated with expanding the Deer Creek WWTP from 15 MGD to 20 MGD. Preliminary design services will be completed for the Deer Creek WWTP expansion and will recommend a final phasing plan approach for the improvements. The Deer Creek WWTP was constructed in 1982 and is rated to treat 15 MGD. The plant underwent upgrades in 1996, 2011, 2014, and 2024. The facility treats wastewater from the Deer Creek sewershed using a combination of automatic bar screening, grit removal, primary clarification, bio-selector (abandoned in place), secondary activated sludge treatment, secondary clarification, floc carry-over, sand filtration, chlorine disinfection, and chlorine removal using sulfur dioxide. The solids treatment process consists of primary and secondary activated sludge. Sludge dewatering is accomplished by belt press operation. All sludge is stabilized with lime to Class B designation prior to land application. This project will include the ability to process sludge from the Chisholm Creek WWTP. Construction Start: Spring 2025. Estimated completion: Summer 2026. The method of Contractor Selection has not been Determined at this time.
Conceptual
Water / Sewer
$300,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 11, 2026
20601 Portland Ave, Edmond, OK
Related To This Project
Edmond, OK
Bid Date: Apr 30 2025
Edmond, OK
Bid Date: Apr 29 2025
Edmond, OK
Bid Date: Apr 29 2025
Edmond, OK
Bid Date: May 08 2025
Edmond, OK
Bid Date: May 15 2025
Edmond, OK
--
Edmond, OK
Bid Date: May 29 2025
Edmond, OK
--
Edmond, OK
Bid Date: May 01 2025
Edmond, OK
Bid Date: May 01 2025
Edmond, OK
Bid Date: May 14 2025
Edmond, OK
Bid Date: Jun 16 2020
Edmond, OK
Bid Date: Mar 04 2021
Edmond, OK
Bid Date: Apr 18 2019
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.