BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 14, 2025 at 8:00 PM

Updated April 15, 2025

Site work for a water / sewer project in Edmond, Oklahoma. Conceptual plans call for site work for a water / sewer project.

Deer Creek Wastewater Treatment Plant Expansion A&E Reference Number 0000382709 Question Acceptance Deadline 04/21/2025 11:00 AM EDT Questions are submitted online Yes The Oklahoma City Water Utilities Trust (OCWUT) is evaluating all requirements to expand capacity at the Deer Creek Wastewater Treatment Plant (WWTP) from 15 million gallons per day (MGD) to 20 MGD. The Engineer will provide all preliminary engineering services required to develop an expansion plan for the Deer Creek WWTP. Final design, bidding, construction administration and management, inspection, and as-built services may be completed under a future amendment OCWUT funds, operates, and maintains the Deer Creek WWTP to provide wastewater services to its citizens and wholes ale customers. The Deer Creek WWTP is an activated sludge treatment plant located in the northwest part of Oklahoma City. This study will determine all requirements associated with expanding the Deer Creek WWTP from 15 MGD to 20 MGD. Preliminary design services will be completed for the Deer Creek WWTP expansion and will recommend a final phasing plan approach for the improvements. The Deer Creek WWTP was constructed in 1982 and is rated to treat 15 MGD. The plant underwent upgrades in 1996, 2011, 2014, and 2024. The facility treats wastewater from the Deer Creek sewershed using a combination of automatic bar screening, grit removal, primary clarification, bio-selector (abandoned in place), secondary activated sludge treatment, secondary clarification, floc carry-over, sand filtration, chlorine disinfection, and chlorine removal using sulfur dioxide. The solids treatment process consists of primary and secondary activated sludge. Sludge dewatering is accomplished by belt press operation. All sludge is stabilized with lime to Class B designation prior to land application. This project will include the ability to process sludge from the Chisholm Creek WWTP. Construction Start: Spring 2025. Estimated completion: Summer 2026. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
40
Bidding Soon
724
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 11, 2026

Project location map

20601 Portland Ave, Edmond, OK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.