BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2025 at 8:00 PM

Updated July 17, 2025

Site work for a civil project in Miami Gardens, Florida. Completed plans call for site work for a water / sewer project.

Upgrade of Sewage Pump Station 0309 LICENSE REQUIREMENT: General Building Contractor; General Engineering; Pipelines Engineering Contractor; Underground Utility / Excavation SCOPE OF WORK: The project consists of furnishing all materials, labor and equipment necessary to demolish existing Sewage Pump Station and construct new proposed Sewage Pumping Station No. 0309 at existing location, the work includes but it is not limited to, excavation, demolition and modification work; removal of existing pumps, motors, valves, piping and fittings; installation of a new 8 Ft inside Diameter wet well, Installation of a new valve vault with 6 inch piping, removal and demolish of existing dry well structure up to 7 Ft below existing ground elevation, top slab and access hatch; removal of existing power/control panel and concrete slab; removal of existing telemetry antenna and remote terminal unit equipment; removal of existing electric service, meter and main disconnect; removal of various existing concrete slabs; removal, transport, salvage and legal disposal of demolition material and equipment; transportation and handling costs, including removal of salvaged equipment to a location designated by the Engineer; furnish, install, operate, and remove temporary sewage effluent bypass pumps, equipment and accessories It is the intent of the Department to obtain a complete and working installation under this Project and any items of labor, equipment or materials which may reasonably be assumed as necessary to accomplish this end shall be supplied whether or not they are specifically shown on the Plans or stated herein. License Requirements - At the time of Bid and pursuant to the requirements of Section 10-3 of the Code of Miami-Dade County, Florida and Request for Price Quotation (RPQ) and Contract Documents, the Bidder and all its subcontractor must hold a valid, current, and active State and/or Miami-Dade County contractor's license consistent with the requirements of the Scope of Work Question Deadline 04/28/2025 he project consists of furnishing all materials, labor and equipment necessary to demolish existing Sewage Pump Station and construct new proposed Sewage Pumping Station No. 0309 at existing location, the work includes but it is not limited to, excavation, demolition and modification work; removal of existing pumps, motors, valves, piping and fittings; installation of a new 8 Ft inside Diameter wet well, Installation of a new valve vault with 6 inch piping, removal and demolish of existing dry well structure up to 7 Ft below existing ground elevation, top slab and access hatch; removal of existing power/control panel and concrete slab; removal of existing telemetry antenna and remote terminal unit equipment; removal of existing electric service, meter and main disconnect; removal of various existing concrete slabs; removal, transport, salvage and legal disposal of demolition material and equipment; transportation and handling costs, including removal of salvaged equipment to a location designated by the Engineer; furnish, install, operate, and remove temporary sewage effluent bypass pumps, equipment and accessories; furnish and install valve vault structure, top slab and access hatch; furnish and place suitable backfill material; furnish and install two 25 HP submersible pumps and related equipment; furnish and install leveler control system and related equipment; furnish and install valve vault sump pump and related equipment; furnish and install new water service piping, enclosure and accessories; furnish and install backflow prevention device; coordinate with FPL for installation of electrical service; furnish and install new electric service, meter and main disconnect; furnish and install the proposed power/control system inclusive of the necessary electrical panel, enclosure, telemetry system and related equipment; install RTU panel and SCADA equipment furnished by the Department; furnish and install RTU and SCADA materials not specifically provided by the Department; electrical work; mechanical work; furnish all materials, equipment and supplies necessary for pump station startup and testing; furnish and install sewage force main pipe and fittings; connection to existing sewage force main; placing asphalt driveway; temporary and permanent replacement of any sod, sidewalk, pavement and/or driveway damaged by construction; site restoration; and other appurtenant and miscellaneous items and work for a complete, satisfactory and functional installation. Sewage Pump Station 0309 located at 5395 NW 165 St. Miami Gardens, FL 33014, Track 3-A, PB page 103 page 6. B. It is the intent of the Department to obtain a complete and working installation under this Project and any items of labor, equipment or materials which may reasonably be assumed as necessary to accomplish this end shall be supplied whether or not they are specifically shown on the Plans or stated herein

Award

Water / Sewer

$2,047,145.00

Public - County

Site Work

63

22

9

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
3
Bidding Soon
1,192
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2025

August 4, 2025

Project location map

5395 NW 165th St, Miami Gardens, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.