Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 12, 2025 at 8:00 PM

Updated April 23, 2025

Site work for a mixed-use development in Kimberley, British Columbia. Completed plans call for site work for a sidewalk / parking lot; and water / sewer project.

Installation of ~220m of sidewalk, drainage upgrades, and re-alignment of the Montgomery and Marsden intersection. Documents can be obtained from www.bcbid.gov.bc.ca Question Deadline: 04/16/2025 at 2:00 PM PT Shane Castle, P.Eng. Address: 340 SPOKANE STREET KIMBERLEY, BC, V1A 2E8 Email: scastle@kimberley.ca Phone: 250 432-1348

Post-Bid

Water / Sewer

$100,000.00

Public - City

Site Work

18

11

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
7
Bidding Soon
93
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2025

June 1, 2025

Project location map

Montgomery Ave & Marsden St, Kimberley, BC

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed