Site work for a power facility in Hillsdale, Michigan. Completed plans call for site work for a power facility.

1. Install and wire the following outdoor switchgear lineup, DC system, Remote control panel, SCADA interfacing panel, and power transformer equipment including the complete support system. 2. Install power and control cables along with all conduits to the equipment per the Drawings. A termination and cable schedule are provided for bidding listing cable and conduits sizes that need to be furnished by this contractor. Shop Drawings for the equipment furnished will be provided to winning bidder. The final terminations will be added once equipment shop drawings are received. 3. Furnish all field labor, tools, materials, and equipment necessary for the complete installation of the equipment furnished located on the furnished foundations in the substation switchyard. 4. The electrical construction work is scheduled to be completed late October 2025 Complete electrical construction for the electrical connection of the furnished equipment consisting of One (1) Outdoor switchgear seven section lineup, One (1) remote operating relay and control panel, One (1) DC system with multiple components and One (1) power transformer. This installation will increase the number of 15 kV feeders connected to the 13.2 kV Industrial Substation Feeder distribution system using the 15 kV outdoor switchgear breaker lineup. The outdoor switchgear lineup is located and installed on a foundation within the Hillsdale-Industrial substation adjacent to Uran Street and Hine Drive. The Power Transformer will be furnished by others and is located and installed on a foundation within the Hillsdale Industrial Substation. The remote operating relay and control panel and DC system will be furnished by the Owner and assembled by this electrical construction contractor. The outdoor switchgear lineup shall be set on the foundation by others. This electrical construction contractor shall uncrate, mount, and assemble the sections on the owner furnished foundations. All interconnecting wiring between all listed components will be provided by this contractor. There will be five (5) 15 kV risers leaving the yard from the outdoor switchgear lineup. This Contractor will engage the services of a recognized independent NETA qualified testing company for the purposes of performing substation relay, control, and functional switchgear testing at the substation site of all installation equipment. The Power Transformer will not be delivered until September 2026. Based on this schedule the switchgear unit will be temporarily energized using the existing Transformer as shown on the drawings. The property for this scope of work is currently owned by the City of Hillsdale, Michigan. To be responsive, all bids must include all equipment, apparatus, materials and Work necessary to be in strict conformance with the Contract Documents. All listed required bid documentation must be included to be a valid and acceptable bid. The City of Hillsdale, Michigan expressly reserves the right to reject any or all bids, to judge the character and sufficiency of the Work offered by the bidders, and to judge the ability of any bidder to perform the Work in a proper manner. A Bid Bond executed by the bidder and a surety company in an amount equal to Ten Percent (10%) of the aggregate amount of the bid shall be submitted with each bid. In lieu of such bond, a certified check in the amount equal to that required in such bond, payable to the City of Hillsdale, Michigan may be submitted. The successful bidder will be required to furnish an acceptable Performance Bond and Labor and Material Bond in the amount of One Hundred percent (100%) of the Contract price. If you have any questions in regard to this Contract, contact (SSOE engineer) Jeremy Tausch at (jtausch@ssoe.com) or (330) 248-7567. Bid Result: Electrical Construction : Kent Power - $1,015,311.00 General Construction : Kent Power - $522,917.00

Award

Power Plant

$522,917.00

Public - City

Site Work

18

19

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2025

July 28, 2025

Project location map

Multiple Locations, Hillsdale, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.