BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 6, 2025 at 8:00 PM

Updated May 7, 2025

Site work and new construction of a water / sewer project in El Paso, Texas. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Scopes of work include: Metal Fabrications, FRP Handrail & Guardrail, FRP Grading & Stair Treads; Arch Cabinets & Countertops; Stainless Steel & Metal Wall Tiles & Panels; Roofing: TPO, Roof Hatch; Joint Sealants, Firestopping, Caulking & Waterproofing, Overhead Door, Flooring: Ceramic Tile, Resilient, Resinous, Terrazzo,; Floor Sealing & Polishing, Signage, Specialties include: Toilet Compartments & Accessories, Wall & Door Protection, Fire Extinguishers & Cabinets, Roller Window Shades, Quartz Countertops, Metal Building, PEMB Canopies, Fences & Gates: Decorative & Chain Link, Asphalt Paving, Site Concrete, Landscape & Irrigation, Laboratory Casework, & UV System. NAICS: 237110, 238110, 238120, 238160, 238330, 238340, 238390, 238910, 238990.332311, 332321, 332323, 339111, 337110, 337212, 337215, 337920, 423330. The new water purification facility will be a large-scale water treatment project to directly purify treated wastewater and redistribute it as potable reuse drinking water. The facility will receive treated wastewater directly from the Roberto R. Bustamante WWTP and purify it using advanced treatment technologies such as microfiltration/ultrafiltration, nanofiltration/ reverse osmosis, UV advanced oxidation, granular activated carbon, stabilization, and chlorine disinfection, before distributing it for urban water use. The main process building will also include designated areas for administration, research, and education. PCL/Sundt JV intends to break up the requirements into smaller portions to encourage maximum participation, arrange time frames for contracts & establish delivery schedules, where the requirements permit, in a way that encourages & facilitates participation of DBE, SLBE, MBE and WBE firms. This Project is federally funded and subject to Federal Labor Standards Provisions, including Davis-Bacon/ Prevailing Wage rates & bidders shall comply with all federal funding requirements including but not limited to: AIS, BABAA, Domestic Procurement Requirements, DBE Compliance, and Federal Wage Requirements. This project is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act ("IIJA"), Pub. L. 177-58. The current BOR General Applicability Public Interest Waiver For WaterSMART Programs Impacted by Drought applies to the project. For assistance with the plan room & general information please contact Lisa Plante via email at LAPlante@pcl.com or via telephone at 480-763- 2778.

Post-Bid

Water / Sewer

$270,000.00

Public - City

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
15
Bidding Soon
280
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.