BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 4, 2025 at 8:00 PM

Updated June 5, 2025

Site work and paving for a sidewalk / parking lot in Devils Lake, North Dakota. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of June 4, 2025, the project was awarded to Lakeview Construction, with an awarded amount of $54,295.25.** Citywide Curb, Gutter & Sidewalk 2025 Curb, Gutter, Sidewalk and Driveway General Notes City of Devils Lake 100-P01 GENERAL: Complete construction according to the 2024 Standard Specifications adopted by the North Dakota Department of Transportation (NDDOT) and the Supplemental Specifications effective on the date the project is advertised. Amend the specifications as follows: the term "Department" will mean the City of Devils Lake or its authorized representative. The terms "Director" and "Engineer" will mean the City Engineer of Devils Lake or the City's authorized representative. 100-P02 AWARD: City of Devils Lake reserves the right to reject any or all bids, to waive technicalities, to award each section of the project individually, to award the bid to multiple contractors or in any combination thereof, that is deemed in the best interest of the City. 100-P03 QUANTITIES: Quantities listed reflect an estimate for total work to be completed in the 2025 construction season and actual quantities may vary from those listed. An increase or decrease from plan quantity will not be accepted as a reason to negotiate any price adjustment. Contractor may provide a bid for any or all items listed. 100-P04 ORDER OF WORK: Work to be issued to the Contractor by the City Engineer, or the City's authorized representative, on an as-needed basis during the contract period. Work will be issued to the Contractor(s) based on availability of the Contractor(s), beginning with the lowest bidder. The City does not guarantee a minimum amount of work issued or the dollar amount of work to be performed. 100-P05 COMPLETION: Begin work on an individual section of the project within 30 days of that section of work being provided to the Contractor. Install new concrete where any concrete was removed within 7 days of initial concrete removal. Complete all site work, including clean up and seeding, within 14 days of initial concrete removal. 100-P06 MATERIAL STORAGE: Minimize use of adjoining roadways for storage of materials. Properly mark any materials placed on the roadway according to the Manual on Traffic Control Devices (MUTCD). The City will remove any materials stored on the roadway or public right of way longer than 7 days at the Contractor's expense. 106-P01 MATERIAL TESTING: Engineer may perform testing on concrete and other material during placement. Material not meeting specifications will be replaced at the Contractor's expense. All testing will be paid for by the Engineer.

Award

Sidewalks / Parking Lot

$54,295.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
3
Bidding Soon
93
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2025

June 4, 2025

Project location map

Multiple Locations, Devils Lake, ND


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.