BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 10, 2025 at 8:00 PM

Updated June 11, 2025

Site work and paving for a mixed-use development in New Boston, Texas. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; and road / highway.

Questions concerning this request shall be directed to Mr. Brian Bobbitt at (903)-628-2521. Requesting proposals for the selection of qualified individuals for the Removal and replacement of a concrete section in the parking lots at the Crestview Elementary building, located at 600 N. McCoy Blvd New Boston, Texas 75570 and the New Boston High School located at 1 Lion Drive, New Boston, Texas 75570, and a 30x50 concrete slab with necessary dirt pad and a ramp connecting new pad to existing drive at the New Boston Administration Offices located at 201 Rice Street, New Boston, Texas 75570. Removal and replacement of concrete section in the parking lot at Crestview Elementary, New Boston High School, and a 30x50 concrete slab with necessary dirt pad and a ramp connecting new pad to existing drive at the New Boston Administration Offices. New Boston Independent School District ("NBISD") is requesting proposals for the selection of qualified individuals for the following: 1. Removal and re-pouring of a section of concrete parking lot (595 sq. ft.) at New Boston Elementary located at 604 N. McCoy BLVD, New Boston, TX 75570, to match existing thickness. (See Exhibit A) 2. Removal and re-pouring of a section of concrete parking lot (960 sq. ft.) at New Boston High School Campus at 1 Lion Drive, New Boston, Texas 75570, to match existing thickness. (Exhibit A) 3. Pouring of a 30ft. x 50ft. concrete slab, four inches thick with twelve-inch footers, using one-half inch rebar spaced 18 inches apart on center at the New Boston ISD Administration Offices, 201 Rice St. New Boston, TX 75570, including the dirt work and pad necessary. (See Exhibit A) 4. Pouring of a concrete ramp (approximately 10ft x 8ft) connecting existing driveway to new slab at New Boston ISD Administration Offices, 201 Rice St. New Boston, TX 75570, including necessary dirt work. ( See Exhibit A)

Post-Bid

Sidewalks / Parking Lot

$100,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
43
Bidding Soon
457
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2025

May 19, 2025

Project location map

Multiple Locations, New Boston, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.