EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 9, 2025 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in McHenry, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The City of McHenry is soliciting bids for the VENICE AVENUE IMPROVEMENTS. The proposed improvements include: 944 FT of Storm Sewers, 1,146 FT of Sanitary Sewers, 1,064 FT of Combination Concrete Curb & Gutter, 1,023 FT of Concrete Gutter, 7,732 SF of PCC Sidewalk, 5,120 SY of HMA Surface Removal, 582 TONS of HMA Binder Course, and 453 TONS of HMA Surface Course. Prior to submitting a bid, a firm interested in submitting a bid as a Prime Contractor must complete and return a Notification of Intent to Bid form no less than three calendar days prior to the bid opening. Notification of Intent to Bid submittals will not be processed by the City after 3:30 PM three (3) calendar days preceding the published letting date. Submittal of the Notification of Intent to Bid shall confirm the bidder's intention to submit a bid and shall serve as the bidder's request for the City's Authorization to Bid. NO BIDS SHALL BE ACCEPTED UNLESS THE CONTRACTOR HAS SUBMITTED THE NOTIFICATION OF INTENT TO BID FORM. The City, in accordance with the laws of the State of Illinois, hereby notifies all Bidders that it will affirmatively ensure that the contract(s) entered into pursuant to this Notice will be awarded to the successful Bidders without discrimination on the ground of race, color, religion, sex, age, sexual orientation, marital status, disability, familial status or national origin. The City reserves the right to reject any or all submittals or to accept the submittal(s) deemed most advantageous to the City. Questions are due to Jeff Strzalka, telephone (815)759-8359, email jstrzalka@hrgreen.com, no later than 12:00 p.m. (CST) on May 1, 2025. The amount of the check is 5% of Bid Amount

Post-Bid

Sidewalks / Parking Lot

$200,000.00

Public - City

Paving, Site Work

47

9

50

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Earthwork Methods, Soil Stabilization, Shotcrete Soil Slope Stabilization
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Curbs and Gutters
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Machining Equipment, Drilling Equipment, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
137
Bidding Soon
2,886
All Active Projects
1,225
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2025

June 9, 2025

img_map_placeholder

Venice Ave, McHenry, IL


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Venice Avenue Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.