Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 23, 2025 at 8:00 PM
Updated May 24, 2025
Site work for a road / highway in Marietta, Georgia. Completed plans call for site work for a road / highway.
Damaged Signal Pole Replacement Project Description: Project consists of replacing damaged signal poles and upgrading intersection infrastructure to Cobb standards at various locations throughout the County. Project Duration: The time allowed for performance of the project will be 365 days from issuance of Notice to Proceed. Contractor and their subcontractors are required to be in compliance with the "Georgia Security and Immigration Compliance Act." Cobb County will affirmatively comply with Title VI of the Civil Rights Act of 1964 and 78 Stat. 252, 42 USC 2000d-42 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, part 21 Nondiscrimination Act(s). Disadvantaged Business Enterprise (DBE) Participation and Small Business Participation in all DOT contracts is encouraged. The Cobb County Board of Commissioners reserves the right to reject all Bids and waive any formalities. The bidder shall furnish the name and phone number(s) of a customer service representative that will serve as a liaison for Cobb County to address all equipment and installation problems. It is the responsibility of this person to provide answers to all questions pertaining to the equipment and installation being provided. If the contact person cannot answer a particular question, it is their responsibility to obtain an answer from an appropriate source. If equipment needs to be repaired or replaced, the contact person is responsible for making arrangements for returns and deliveries. All correspondence shall be through the contact person, unless otherwise agreed upon by Cobb County. This section contains requirements for installing traffic control signal equipment, submittal processes, testing, warranty, and contractor's signal maintenance responsibilities. The contractor shall install all equipment, poles, bases, wiring, and incidental materials required for a complete and functional traffic control signal installation according to this section. Traffic control signal installations include traffic signals, Pedestrian Hybrid Beacons (PHB), Rectangular Rapid Flashing Beacons (RRFB), flashing beacons, and school speed zone flashing beacons. The Department shall perform reviews and grant approval on projects constructed at intersections and any other location under the jurisdiction of the Department. For intersections and locations not under the jurisdiction of the Department, the local agency having jurisdiction shall perform reviews and grant approval. All specified traffic control signal equipment shall be installed without modification. The contractor shall install the traffic control signal equipment according to the contract. For traffic control signal installations, no deviations in the design and operation of the traffic control signal are permitted without the written approval of the Engineer. Table 1 provides a listing of roles, responsibilities and approval steps in the preconstruction and construction process. Steel Strain Pole, Concrete Strain Pole, or Steel Pole Certification a. Prior to ordering signal poles, locate utilities and stake the Right-of-Way for the purpose of adjusting pole locations, if necessary. Coordinate with the District office and local agencies to verify the location of any buried traffic/ITS communication lines. The Department is not a member of 811. b. Obtain approval from the Signal Design Engineer or designee for any design deviation from the contract. c. Final pole locations will be approved by the Construction Manager or designee. Determine the final length of mast arms based on field adjusted pole locations. d. Instruct the supplier or manufacturer of the strain poles or steel poles with mast arms to submit a certification, including mill certificates to the Office of Materials and Testing (for State routes) or the Signal Design Engineer (for local roads):
Post-Bid
Roads / Highways
$100,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2025
June 9, 2025
Multiple Locations, Marietta, GA
Related To This Project
Marietta, GA
--
Marietta, GA
Bid Date: May 08 2025
Marietta, GA
Bid Date: May 15 2025
Marietta, GA
Bid Date: May 08 2025
Marietta, GA
Bid Date: May 16 2025
Marietta, GA
Bid Date: May 02 2025
Marietta, GA
--
Marietta, GA
Bid Date: May 22 2025
Marietta, GA
Bid Date: May 08 2025
Marietta, GA
Bid Date: May 08 2025
Marietta, GA
--
Marietta, GA
Bid Date: Apr 22 2025
Marietta, GA
Bid Date: Apr 24 2025
Marietta, GA
Bid Date: Apr 21 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
