Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 14, 2025 at 8:00 PM
Updated July 15, 2025
Site work for a swimming pool in Cobourg, Ontario. Completed plans call for site work for a swimming pool.
Reference Number 0000291300 The Municipality of Souris-Glenwood operates an outdoor community pool, in the Victoria Park Campground, vital to our summer recreational activities. The community pool was constructed in 2009 with a concrete base and prefabricated steel wall panels. The Municipality requires the concrete surface to be repaired as needed and the pool liner replaced. Scope of Work a. Draining the Pool: Professionally remove the remaining water from the swimming pool using appropriate equipment and methods. b. Membrane Removal and Disposal: Carefully remove the existing membrane, ensuring a thorough and complete disposal process in accordance with environmental regulations. c. Leak Detection: Pressure testing of all buried plumbing lines, including wall return inlets and main drains, as well as a visual inspection of the facility's mechanical room with a written report provided to the facility. d. Concrete Floor Inspection: Conduct a comprehensive inspection of the concrete floor, documenting its current condition and identifying any areas that require attention. e. Concrete Flooring Repair and Grouting: Perform necessary repairs to the concrete flooring, including grouting beneath the Stainless-Steel pool structure. Ensure pool surface is prepared as per specification and supplier recommendation. f. ABS Components Removal and Disposal: Safey remove and dispose of all ABS components, including pool coping, grating and return fittings, following proper waste disposal procedures. g. Gutter Waterproofing Inspection and Sealing: Inspect the gutter system for waterproofing issues and apply a sealing as needed, addressing any potential leakage points. h. Powder Coated Steel Wall Panel System Preparation: Thoroughly inspect and prepare the existing panel system for re-lining, ensuring a smooth and suitable surface for the installation process. i. Sub-Flooring Installation: Install Ply-Extruded Matting (PEM Soft-Walk) as sub-flooring, providing a cushioned and supportive foundation for the new pool liner. j. Membrane Installation: Professionally install the membrane on the pool walls, ensuring precise fitting and adherence, followed by meticulous sealing for optimal durability. k. Thermo-Plastic Welding: Utilize thermos-plastic welding techniques to establish a secure connection to the existing infrastructure, ensuring seamless and watertight integration. I. PVC Membrane Installation on Pool Floor: Expertly install the membrane on the pool floor, ensuring precise fitting an adherence to create a watertight seal. Apply PVC sealing to enhance durability and longevity. m. Thermo-Plastic Welding to Existing Main-Drain Flanges: Employ thermo-plastic welding techniques to establish a secure connection between the newly installed components and the existing main-drain flanges, ensuring seamless and robust integration. n. Installation of New ABS Components: Integrate new ABS components, including coping, grating and pool fittings, with precision and adherence to industry standards, enhancing the aesthetics and functionality of the pool. o. Black 4 x Floor and Wall and Depth Markings: Black Lines 4 x floor and wall markings with precision, ensuring clear visibility and longevity of the markings, enhancing safety and aesthetics. p. Cleaning: Broom clean pool and surrounding deck area. Remove marks or dirty spots. Remove all trash and debris. q. Pool Fill and Commissioning: Execute the pool filling process efficiently, taking necessary measures to prevent any damage to the newly installed components. Commission the pool, ensuring all systems are operational, and conduct a comprehensive check to confirm readiness for use. r. Service & Care: Provide a service and care session of approximately 2 hours with the owner-designated authority. Provide a patch kit and care instructions in a written format (and digital), plus approximately 15 square meters of colour-matched patch material. Official bid documents must be obtained from www.merx.com
Post-Bid
Swimming Pools
$200,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 30, 2025
July 30, 2025
138 Division St, Cobourg, ON
Related To This Project
Cobourg, ON
Bid Date: Jun 03 2025
Cobourg, ON
Bid Date: Aug 07 2025
Cobourg, ON
Bid Date: Dec 15 2020
Cobourg, ON
--
Cobourg, ON
Bid Date: Jul 02 2025
Cobourg, ON
Bid Date: Aug 26 2025
Cobourg, ON
Bid Date: Dec 22 2020
Cobourg, ON
Bid Date: Apr 29 2025
Cobourg, ON
Bid Date: Apr 15 2021
Cobourg, ON
Bid Date: Apr 30 2025
Cobourg, ON
--
Cobourg, ON
--
Cobourg, ON
Bid Date: Apr 01 2025
Cobourg, ON
Bid Date: Oct 08 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
