Published June 13, 2025 at 8:00 PM

Updated June 14, 2025

Site work for a water / sewer project in San Joaquin, California. Completed plans call for site work for a water / sewer project.

**As of June 13,2025, project was awarded to Sierra Communications & Construction, Inc., awarded amount is $3,048,697.19.** The work is located San Joaquin County near Lodi, California as well as near Stockton, California and is situated along Potter Creek, Mormon Slough, Bear Creek, Paddy Creek, North Paddy Creek, and Little John Creek. The work, in general, consists of removing existing pipe penetrations through levees and replacing with reinforced concrete pipes, installing flap and slide/canal gates, reinforced concrete riser structures, and new reinforced concrete inlet/outlet structures as prescribed in the project plans and specifications. Questions submitted less than 72 hours in advance of bid opening may not receive a response *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Work sites are accessible via levee roads with varying access conditions and constraints based on the time of year. The following routes identify known site access routes; however, the contractor is responsible for making necessary preparations, including coordinating with the County, for each site before entering access and work areas. The County will obtain any necessary Temporary Entry Permits (TEPs) for access to the work area and the applicable properties. Site 18539 From CA HWY-99, take exit 252B toward S. Golden Gate Ave onto CA-4 east. Continue for approximately 5 miles on CA-4 E, then turn left onto S. Jack Tone Rd. Travel north on S. Jack Tone Road for 1 mile, then enter levee road to work area. Work site is approximately 0.5 miles along levee road. Allowable Work Dates: July 1,2025 - Oct 31, 2025 Site 23247/23454 From CA HWY-99, take exit 252B for Golden Gate Ave, then turn right onto S. Golden Gate Ave. Travel about 0.8 miles then turn right onto Doctor M.L.K Jr Blvd then turn right onto E. Main Street for approximately 2 miles, then turn right onto levee road towards work area. Work site is approximately 1.25 miles along levee road. Allowable Work Dates: July 1,2025 - Oct 31, 2025 Site 23249 From CA HWY-99, take exit 252B for Golden Gate Ave, then turn right onto S. Golden Gate Ave. Travel about 0.8 miles then turn right onto Doctor M.L.K Jr Blvd then turn right onto E. Main Street for approximately 2 miles, then turn right onto levee road towards work area. Work site is approximately 1 mile along levee road. Allowable Work Dates: July 1,2025 - Oct 31, 2025 Site 23308 From CA HWY-99, take exit 254B for CA-26/Fremont St toward Linden. Turn left onto CA-26 E/State Rte. 26 E and travel east for 8.8 miles. Then turn right onto Duncan Rd and travel 1.4 miles, before turning left onto E Tobacco Rd. Travel 0.9 miles on to work site. Allowable Work Dates: Oct 1,2025 - Oct 31, 2025 Site 23332 From CA HWY-99, take exit 254B for CA-26/Fremont St toward Linden. Turn left onto CA-26 E/state Rte. 26 E and travel east for 8.8 miles. Then turn right onto Duncan Rd and travel 2.1 miles, before turning left onto E Milton Rd. Travel 0.5 miles then turn left on asphalt road and travel north along levee 0.8 miles to work site. Allowable Work Dates: Oct 1,2025 - Oct 31, 2025 Site 23344 From CA HWY-99, take exit 252B for Golden Gate Ave and travel 0.3 miles before turning onto CA-4 E/S Golden Gate Ave. Continue onto CA-4 E for approximately 5 miles and then turn left onto S. Jack Tone Rd. Travel north 1.6 miles before turning right onto the levee road towards work area. Work site is approximately 0.7 miles along levee road. Allowable Work Dates: Oct 1,2025 - Oct 31, 2025 Site 23761 From CA HWY-99, take exit 255 following signs for CA-88 E towards Jackson. Travel 8.8 miles along CA-88 E /Waterloo Rd, then turn right to enter levee road before crossing Bear Creek bridge. Work site is approximately 100 feet along levee road. Allowable Work Dates: July 1,2025 - Oct 31, 2025 Site 23844 From CA HWY-99, take exit 255 for CA-88 E/Waterloo Rd towards Jackson. Travel 9.5 miles along CA-88 E, then turn right onto E Harney Ln. Travel 1.5 miles on E Harney Ln then turn right onto N Jack Tone Rd. Travel southbound 0.5 miles, crossing South Paddy Creek bridge then turn right onto levee road towards work area. Work site is approximately 0.25 miles along levee road. Allowable Work Dates: July 1,2025 - Oct 31, 2025 Site 23920 From CA HWY-99, take exit 255 for CA-88 E/Waterloo Rd toward Jackson. Travel 9.5 miles along CA-88 E, then turn right onto E Harney Ln. Travel 1.5 miles on E Harney Ln then turn left onto N Jack Tone Rd. Travel northbound 2.1 miles on N Jack Tone Rd, then turn right onto E Sargent Rd and continue for 0.7 miles before turning right onto levee road. Work site is approximately 50 feet along levee road. Allowable Work Dates: July 1,2025 - Oct 31, 2025 Site 23926/23928 From CA HWY-99, take exit 255 for CA-88 E/Waterloo Rd toward Jackson. Travel 9.5 miles along CA-88 E, then turn right onto E Harney Ln. Travel 1.5 miles on E Harney Ln then turn left onto N Jack Tone Rd. Travel northbound 2.1 miles on N Jack Tone Rd, then turn right onto E Sargent Rd and continue for 0.7 miles before turning right onto levee road. Work site is approximately 0.5 miles along levee road. Allowable Work Dates: July 1,2025 - Oct 31, 2025 Site 23998 From CA HWY-99, take exit 246-French Camp Rd toward French Camp. Travel along French Camp Rd (from the east) for 2.0 miles then turn right onto S Airport Way. Travelling north along S Airport Way, turn right onto levee road towards work area. Work site is approximately 0.4 miles along levee road. Allowable Work Dates: July 1,2025 - Oct 31, 2025 DSID:# 18539,23247/23454, 23249,23308, 23332, 23344, 23761,23844, 23920,23926/23928, 23998

Award

Water / Sewer

$3,048,697.00

Public - County

Site Work

72

10

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
24
Bidding Soon
715
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2025

July 1, 2025

Project location map

Multiple Locations, San Joaquin, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.