Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 13, 2025 at 8:00 PM
Updated June 14, 2025
Renovation of an educational facility in Santa Clara, California. Completed plans call for the renovation of a educational facility.
License Requirements B - General Building or C-38 Refrigeration Liquidated Damages $1500/day see bid documents Start/Delivery Date June 30th, 2025 Project Duration 30 Question Deadline 04/30/2025 at 4:00 PM PT Online Q&A Yes Work funded by Measure W is subject to the Project Labor Agreement for West Valley-Mission Community College District ("PLA"). Bidders and their subcontractors awarded a Contract for the Work must agree to be bound by the PLA during performance of the Work. DESCRIPTION OF WORK A. Commissioning is a designed quality-assurance process for achieving, verifying and documenting that the performance of facilities, systems, and assemblies meet the Owner’s documented objectives and criteria. The design team, contractor and subcontractors provide the quality control for the design, the installation and startup of the building systems. The commissioning process provides review and quantitative functional testing in order to provide assurance that the quality control efforts of the designers and contractors are successfully completed. B. Commissioning includes the completion of a formal commissioning process on the equipment and systems within the Commissioning Scope of Work, as specified within Section 01 91 13. Commissioning is performed by the Commissioning Team under the leadership of the Commissioning Authority (CA). The entire Commissioning Team is responsible for performing the process and achieving successful commissioning results. Commissioning Team is defined in Definition of Terms portion of this section of the specifications. The CA is a totally independent firm under contract directly with the Owner, and is not contractually or financially associated with the Design Team or any Contractor performing work on this project. C. Commissioning Standards: The commissioning process shall be in accordance with: 1. All sections of the Contract Documents 2. 2019 California Code of Regulations (CCR) Title 24 3. California Green Building Standards Code - CALGreen D. Contractors' Responsibility: The Contractor is responsible for completion of the specified commissioning work. The contractors responsibilities include: 1. The General Contractor shall provide a Commissioning Coordinator (CC), as defined in Definition of Terms portion of this section of the specifications. The General Contractor’s Commissioning Coordinator is responsible for managing the specified commissioning work. General Contractor shall ensure that all sub-contractors including but not necessarily limited to mechanical, electrical, test and air balance, controls, and plumbing disciplines are fully familiar with the commissioning requirements and responsibilities stated herein. 2. The Contractor shall be responsible for providing material, equipment, access, meters and instrumentation, and labor to participate in the specified commissioning process. The Contractor will assure the participation and cooperation of sub-contractors and vendors under their jurisdiction, as required to complete the commissioning process 3. Contractor shall be responsible for having independent agencies provide electrical systems tests as specified in Division 26 or other applicable sections of the contract documents. 4. The Contractor will support the commissioning process by integrating it into the construction process and schedule. 5. Contractor shall coordinate start-up and testing and balancing phases so as to allow a reasonable time for the commissioning tests to be conducted prior to building occupancy or campus specified operational date for the project. 6. Contractor shall demonstrate through functional tests provided by the commissioning authority that systems perform per design. E. Support of Materials, Equipment and Systems Suppliers: Suppliers of major equipment and systems within the Commissioning Scope of Work (specified elsewhere in Section 01 91 13) shall support the commissioning process. Minimum support shall consists of the following: 1. Submit the manufacturer’s installation & startup manual as a part of the initial equipment submittal. 2. Submit the manufacturer’s operating and maintenance manual as a part of the initial equipment submittal 3. Conduct inspection of completed installations per installation check lists provided by equipment manufacturer and ensure satisfactory completion of installation as recommended by the manufacturers of various equipment. 4. Conduct inspection of installation per the Pre-Functional Check List established by the Commissioning Authority and coordinate such inspections with the CA. 5. Assist in developing the final functional test procedures as specified in Sections 01 91 13, Division 23, Division 26 and related sections. 6. Provide authorized startup technician as well as other sub-contractor resources as required to perform functional performance testing as specified in Sections 01 91 13, Division 23, Division 26 and related sections.
Award
Educational
$277,777.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 12, 2025
June 2, 2025
3000 Mission College Blvd, Santa Clara, CA
Related To This Project
Santa Clara, CA
Bid Date: Apr 29 2025
Santa Clara, CA
Bid Date: Apr 25 2025
Santa Clara, CA
Bid Date: May 14 2025
Santa Clara, CA
Bid Date: May 29 2025
Santa Clara, CA
Bid Date: Jun 10 2025
Santa Clara, CA
Bid Date: May 28 2025
Santa Clara, CA
Bid Date: Jul 10 2025
Santa Clara, CA
Bid Date: May 21 2025
Santa Clara, CA
Bid Date: May 01 2025
Santa Clara, CA
Bid Date: May 01 2025
Santa Clara, CA
Bid Date: Jul 01 2025
Santa Clara, CA
Bid Date: May 29 2025
Santa Clara, CA
Bid Date: May 06 2025
Santa Clara, CA
Bid Date: May 13 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.