Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 29, 2025 at 8:00 PM

Updated April 30, 2025

Site work and paving for a mixed-use development in Houston, Texas. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Cost Range: $340,000 - $400,000 The Water Plant Chloramine Conversion project includes installing a concrete sidewalk, a swale with an outfall, powder-coated bollards, and relocating chloramine equipment. It also involves installing a 12-inch DIP surface fill line, static mixers in existing and proposed piping, and 1-inch PVC CL2 and LAS injection lines. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Sidewalks / Parking Lot

$670,000.00

Public - City

Paving, Site Work

19

17

26

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
443
Active Projects
255
Bidding Soon
3,917
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed