EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 12, 2025 at 8:00 PM

Updated May 13, 2025

Site work and paving for a road / highway in Les Jardins-de-Napierville, Quebec. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Reference number: 20064183 Deadline for receipt of complaints 2025-04-24 Expected contract duration without options (in months) 1 Schedule of work (III-4.5) Article III-4.5 is supplemented by the following text: According to the written order to proceed with the execution of the work, the contractor will have as many days, as mentioned in article 1.2 "SCHEDULE" of this Part, consecutive calendar excluding holidays and mandatory holidays by the CCQ for the complete execution of the construction works. It must provide the necessary staff in order to carry out its work within the time frame provided for in this schedule. The contractor must take into account that some of the work may be carried out in winter and/or thaw conditions, depending on the date of the order to begin the work. No claim may be submitted for winter conditions and/or thaw if the order to start work is given within the tender validity period. The schedule will be analyzed by the client and supervising engineer, thus becoming a fully-fledged contractual document. The Contractor shall make all necessary arrangements to complete the work in accordance with the submitted schedule. Schedule The Contractor shall proceed expeditiously and establish its work schedule so that the completion of the work, including all tests, is within the prescribed time frame. Long deadline The work subject to this contract must be completed by June 6, 2025 The date of authorization to start the work will be recorded in the minutes of the kick-off meeting and it will become contractual for the calculation of the duration of the work. The Contractor shall carry out the work without interruption and provide a sufficient number of crews to meet the above schedule. Short Lead Time Within the long lead time, the Contractor has only ten (10) business days to complete all work on site, failing which the Client will apply the "Damages for Delay" clause. The short term is the number of days required to complete the work. A working day is a day from Monday to Friday from 7:00 am to 6:30 pm. If weather conditions prevent the completion of the work, the extension of the short deadline is calculated as follows: o one day: if the work is interrupted between 7 and 10 o'clock and does not resume during the day; o half-day: if work is interrupted between 10:00 and 3:30 pm and does not resume during the day; o no additional time if work is interrupted after 3:30 pm.

Award

Roads / Highways

$948,367.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
225
Active Projects
123
Bidding Soon
1,747
All Active Projects
727
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2025

June 2, 2025

img_map_placeholder

Chem. Moore, Les Jardins-de-Napierville, QC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.