BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 14, 2025 at 8:00 PM

Updated May 15, 2025

Site work and paving for a sidewalk / parking lot in Fresno, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Fresno Unified School DISTRICT ("DISTRICT") will receive sealed bids for Bid No. 25-45, Hoover High School Concrete Sidewalks and Seat Wall Replacement , to remove existing sidewalk concrete and replace with new concrete sidewalks and seat walls. DISTRICT hereby notifies all bidders that they will affirmatively ensure that in any Contract entered into pursuant to this advertisement, disabled veteran business enterprises (DVBE) will be afforded full opportunity to submit proposals in response to this invitation and will not be discriminated against on the grounds of race, color, creed, sex or national origin in consideration for award. The DVBE goal for the project is as follows: three percent (3%) of the dollar amount of the Contract. Notice is hereby given pursuant to the provisions of Section 1770 et seq of the California Labor Code, each worker of the contractor and any of its subcontractors engaged in work on the Project shall be paid not less than the prevailing wage rate. The project is subject to compliance monitoring and enforcement by the Department of Industrial Relations (DIR). Pursuant to Labor Code Section 1725.5, the DIR established a Contractor Registration Program, in which no contractor or subcontractor shall bid on, be listed in a bid, or engage in the performance of any public work contract without being registered. Prime Contractor must have a valid Class "B" Contractor's License. The time allowed for completion for the project shall be 45 Calendar days. The Architect/Engineers' estimate for this project is around $503,800 (not inclusive of $75,000 allowance). Bids shall be accompanied by a certified check, cashier's check, or a bidder's bond in an amount not less than ten percent (10%) of total bids made payable to Fresno Unified. The substitution of appropriate securities in lieu of retention amounts from progress payments in accordance with Public Contract Code Section 22300 is permitted. The Bid documents are on file at Fresno and Tulare Builders Exchanges; and Fresno Reprographics. Pursuant to Public Contract Code 3400(c)(2), Fresno Unified School DISTRICT finds that it is in the best interest of the DISTRICT to standardize the products, equipment, and materials listed in Exhibit A-1 and Exhibit A-2 in order to match other products/equipment in use on a particular work of improvement either completed or in the course of completion. Where a specific brand, trade name, material, or product identified in the bid documents is also listed in Exhibit A-1 or Exhibit A-2, it shall be deemed to be followed by the words "No Substitutions," and CONTRACTOR shall not make or request substitutions regarding any such product, equipment or material. Exhibit A-1 and Exhibit A 2 may be obtained from DISTRICT Purchasing Department web page under public works CUPCCAA

Bid Results

Sidewalks / Parking Lot

$424,875.00

Public - City

Paving, Site Work

15

18

16

6

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
53
Bidding Soon
603
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2025

June 12, 2025

Project location map

5550 N First St, Fresno, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.