BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 8, 2025 at 8:00 PM

Updated May 13, 2025

Site work and paving for a road / highway in Chicago, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Public Building Commission of Chicago is soliciting Bids from General Contractors (including firms proposing to have a controlling interest in Joint Ventures) for the following project: WORKS PROGRESS ADMINISTRATION ("WPA") STREET RECONSTRUCTION (N. MASON AVE. - W. 56TH ST. - S. HOYNE AVE.) CHICAGO, IL Examination of Documents By Bidder The Bidder shall, before submitting its bid, carefully examine all Contract Documents, including but not limited to, the Project Information, Instructions to Bidders, and Execution Documents (Book 1); Standard Terms and Conditions (Book 2); Technical Specifications (Book 3); plans; drawings; Addenda (if any); and bonds. The Bidder will be responsible for all errors in its bid resulting from failure or neglect to comply with these instructions. The PBC requests that all questions related to this solicitation be submitted in writing via email to the attention of Dee Taylor at dee.taylor@cityofchicago.org. no later than April 29, 2025. B. Interpretations of Addenda The Commission will not furnish oral interpretations of Contract Documents, before or subsequent to the award of a contract. If an interpretation is desired by a prospective Bidder, the interpretation should be requested in a letter addressed to the PBC, ATTN: Dee Taylor, Contract Officer or via email to: dee.taylor@cityofchicago.org. Every interpretation or revision will be in the form of an addendum to the Contract Documents and, when issued, will be on file in the office of the Commission and available on PBC's website at: http://www.pbcchicago.com. It shall be the Bidder's responsibility to inquire as to the addenda issued. All such addenda shall become part of the Contract and attached thereto. The Bidder's failure to acknowledge in writing any issued addenda on the Contractor's Bid page, Section IV. A. (Bid and Execution Documents-Contractor's Bid), shall result in the Commission finding the bid nonresponsive and rejecting the bid. The Commission shall not allow any Bidder to acknowledge any such addenda, in writing or orally, after Bidder has submitted its bid to the Commission. Pre-Award Meeting Date, Time, and Location: A Pre-Award is tentatively scheduled for Thursday, May 8, 2025 at 10:30a.m. via a virtual meeting platform. Meeting details will be issued by the Contract Officer to the Lowest Apparent Responsible Bidder. Technical Review Meeting Date, Time, and Location: Monday, April 21, 2025, at 11:30a.m. via ZOOM virtual meeting platform. For meeting details, refer to Section II.A.20. Site Visit Meeting Date, Time, and Location: NONE Requests for Information: Bidders are to submit requests for information, in writing, via email to the attention of Dee Taylor, PBC Contract Officer at: dee.taylor@cityofchicago.org CDOT PROJECTS #B-4-332, #B-4-333 AND #B-4-346 General Description of Scope of Work: The project consists of a Works Progress Administration ("WPA") street reconstruction Project, including: full-depth pavement reconstruction of the three (3) locations indicated above. Work includes but is not limited to excavation, portland cement concrete base course, hot-mix asphalt surface course, sewer main and drainage structures, water main, concrete curb and gutter, concrete sidewalks, brick pavers (N. Mason Ave. only), tactile/detectable warning surface system for curb ramps, concrete driveways and alleys, roadway lighting, thermoplastic pavement marking, signs, topsoil, sodding, tree removal and planting. Contractor will be required to prepare a Phasing and Logistics Plan within thirty (30) days of issuance of the Notice to Proceed ('NTP') for review and approval by CDOT and PBC, prior to the mobilization and commencement of any Work. The Contractor shall also be responsible for providing critical submittals, including electrical lighting (poles and luminaires), sewer and water main, and concrete mix design, as determined by the PBC, within thirty (30) days of issuance of the NTP. Project includes City of Chicago Department of Water Management ("DWM") Lead Service Line Replacement Work; total of 20 service lines at N. Mason Avenue, two (2) service lines at 56th Place, and 19 service lines at S. Hoyne Street. DWM requires approximately two (2) days per location to perform the work. DWM's work is anticipated to commence Q3-2025. Upon Contract Award of the new WPA Project, a meeting will be scheduled to review and confirm any/all coordination items, including DWM's planned work activities. 3. Construction Budget for Base Work Only: $6.0M - $6.1M (excluding Allowances and Commission's Contract Contingency Funds). 4. User Agency: City of Chicago - Department of Transportation (CDOT) 5. Projects are located in Wards: 45 (North Mason Ave.), 20 (West 56th Pl.) and 16 (South Hoyne Ave.) 6. For purposes of the community hiring requirement, "Project Community Residents" shall mean persons domiciled within the Project Community Areas as designated on "Exhibit# 3 Project Community Area Map Pre-Qualification of Bidders {INTENTIONALLY OMMITTED}

Post-Bid

Roads / Highways

$6,100,000.00

Public - City

Paving, Site Work

130

18

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
3
Bidding Soon
2,134
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.