BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 10, 2025 at 8:00 PM

Updated June 11, 2025

Site work for a civil project in Salt Lake City, Utah. Completed plans call for site work for a road / highway; and water / sewer project.

Construction of a two-stage foul air biotower and associated controls and piping on a 0.33-acre site, including grading of the site, an access driveway, site fencing and gates, landscaping, connections to existing water, sewer, & power utilities, and approximately 430 feet of a 24 HDPE foul air line connecting to a sewer manhole in 1000 West. Questions Due Date: Apr 29th 2025, 2:00 PM MDT Contract Time shall: 1. Be 365 calendar days after the date of the Notice to Proceed.

Award

Water / Sewer

$2,506,000.00

Public - County

Site Work

32

20

2

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
79
Bidding Soon
1,036
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2025

July 2, 2025

Project location map

Multiple Locations, Salt Lake City, UT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.