BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 1, 2025 at 8:00 PM

Updated December 4, 2025

Site work for a water / sewer project in Kingston, New York. Completed plans call for site work for a water / sewer project.

The project consists of replacement of six total wastewater pumps, various valves and piping, and new variable frequency drives including controls located at the East Bridge St. and Ripley St. Pump Stations for the Village of Saugerties. The contract will have two proposals General Construction and Electrical Construction. East Bridge St. and Ripley St. Pump Station Improvements, for the Village of Saugerties, Ulster County, New York, are sought and requested as set forth in specifications prepared by Brinnier and Larios, P.C., 67 Maiden Lane, Kingston, New York 12401. Each bidder must deposit with his bid, security in the amount of not less than five percentum (5%) of the bid in the form of a certified check or bid bond subject to the conditions of this contract. The successful bidder shall furnish a Performance Bond and a Labor and Material Payment Bond in the amount of 100% of the accepted bid as set forth in the Bid Form. These Bonds shall be in compliance with the Specifications. Doc note; Copies of these documents may be obtained at these offices upon deposits of $50.00 per set. All payments shall be made payable to Brinnier and Larios, P.C. Payment for documents represents reproduction costs and therefore is non-refundable. Contract documents may be mailed first class upon receipt of a check payable to Brinnier and Larios, P.C. in the amount of $10.00 to cover postage and handling costs. Digital copies of all contract documents may also be obtained by visiting online. All online contract documents are free of charge and bidders must complete the necessary registration form to receive the links for digital download. Brinnier and Larios, P.C. is not responsible for the accuracy of any digital contract documents that are downloaded outside of the direct download from our website. The Village Board expressly reserves the right to waive any informalities in or to accept any bid, or to reject any and all bids, or to award on any or all items, as the interest of the Village of Saugerties may appear to require. All work shall be completed in 420 consecutive calendar days from the date set forth in the Notice to Proceed.

Award

Water / Sewer

$49,985.00

Public - City

Site Work

11

15

10

5

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
605
Active Projects
325
Bidding Soon
4,323
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2025

June 20, 2025

Project location map

Multiple Locations, Kingston, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.