BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 8, 2025 at 8:00 PM

Updated July 9, 2025

Site work and paving for a road / highway in Pleasanton, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of July 8,2025, the project was awarded to O’Grady Paving, Inc., with an awarded amount of of $4,038,462.70 .** Reference Number 0000383816 Job Location: Pleasanton, California **The City requires all parties interested in this bid opportunity to email the City and request to be added to the plan holder list. See Notice to Bidders for more information. ** There are two components to this project: The first component is preventative maintenance work in preparation for the City's Annual Slurry Seal Project; the second component is the Annual Street Resurfacing Project work. The preventive maintenance work includes approximately 30,000 square feet of full-depth HMA repair (dig-out) and 12,000 pounds of crack sealing on various streets in preparation for approximately 740,000 square feet of slurry-seal work that the City will perform under a separate contract. The preventative maintenance work shall be completed no later than August 29, 2025. The Annual Street Resurfacing Project work involves resurfacing approximately 1,230,000 square feet of existing pavement (approximately 12,500 tons HMA) and approximately 100,000 square feet of full-depth HMA pavement repair on various streets with HMA overlay, HMA overlay with paving mat, HMA overlay over cold-planed pavement, or HMA overlay over the cold-in-place recycle pavement. The project also includes the installation of asphalt leveling course in various locations, wedge grinding or milling, adjusting manholes and valve boxes, etc. to grade, traffic striping and pavement legends, pavement markers, traffic signal loops, traffic control and any necessary coordination with other projects occurring within the vicinity of the project site. The contractor shall furnish all labor, materials, equipment, incidentals, transportation and other necessary services to complete the work in accordance with these Project Plans and Special Provisions. Question Deadline 04/30/2025 at 5:00 PM PT Questions are submitted online No Buyer Preferences, Guidelines & Requirements General Requirements - Certified Payroll - Contractors License Required - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Maintenance Bond 10 % - Labor and Materials Bond 100 % Each Bid Proposal shall be accompanied by either cash, a cashier's check or a certified check, amounting to not less than ten percent of the bid, payable to the order of the City of Pleasanton or by a bond for that amount and payable in the form contained in this bid package. The successful Bidder will be required to furnish performance and payment bonds, each in an amount not less than one hundred percent (100%) of the contract price, and a maintenance bond not less than ten percent (10%) of the contract price. The City reserves the right to reject any or all bids and to determine which bid is, in the City's judgment, the lowest responsive and responsible bid of a Bidder or group of Bidders. The City also reserves the right to waive any inconsequential omissions or discrepancies in any bid and to delete certain items listed in the bid as set forth therein. Costs for developing, submitting, and presenting bids are the sole responsibility of the Bidder and claims for reimbursement will not be accepted by the City. The Engineer's cost estimate for the project is $4,100,000.

Award

Roads / Highways

$4,038,462.00

Public - City

Paving, Site Work

35

7

32

7

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
521
Active Projects
212
Bidding Soon
3,116
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2025

July 9, 2025

Project location map

Multiple Locations, Pleasanton, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.