Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 6, 2025 at 8:00 PM
Updated May 10, 2025
Site work and paving for a sidewalk / parking lot in Holliston, Massachusetts. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The HOLLISTON HOUSING AUTHORITY, the Awarding Authority, invites sealed bids from Contractors for the Parking lot repaving, ramps, curbing. at State Aided Development: Cutler Buildings (705-1) in Holliston, Massachusetts, in accordance with the documents prepared by ALLEN & MAJOR ASSOCIATES, INC.. The Project consists of but not limited to: Remove and reconstruct parking lot. Remove and reconstruct sidewalk. Install new precast concrete curbing. Grading. Remove and replace retaining wall, steps, and handrails. Construct concrete dumpster pad, fencing, bollards. Pavement markings, signage. Loam and seed all disturbed and bare areas. Other minor associate site work. The work is estimated to cost $99,900.00. All bidding Requests for Information (RFIs) shall be submitted online by 04/29/2025 at 10:00AM EDT for general bids. General bids and sub-bids shall be accompanied by a bid deposit that is not less than five (5%) of the greatest possible bid amount (including all alternates) and made payable to the HOLLISTON HOUSING AUTHORITY. Note:Abid deposit is not required for Projects advertised under $50,000.
Post-Bid
Sidewalks / Parking Lot
$99,900.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 9, 2025
June 9, 2025
59 Hollis St, Holliston, MA
Related To This Project
Holliston, MA
Bid Date: May 09 2025
Holliston, MA
Bid Date: May 12 2025
Holliston, MA
Bid Date: Jul 23 2025
Holliston, MA
Bid Date: Jun 20 2025
Holliston, MA
Bid Date: Jun 13 2025
Holliston, MA
Bid Date: Jun 13 2025
Holliston, MA
Bid Date: Aug 08 2025
Holliston, MA
Bid Date: Aug 22 2025
Holliston, MA
Bid Date: Feb 28 2025
Holliston, MA
Bid Date: Feb 21 2025
Holliston, MA
Bid Date: Feb 12 2025
Holliston, MA
Bid Date: Feb 21 2025
Holliston, MA
Bid Date: Jan 23 2020
Holliston, MA
Bid Date: Jan 09 2025
Holliston, MA
Bid Date: Jan 13 2021
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
