BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 28, 2025 at 8:00 PM

Updated May 2, 2025

Site work and paving for a road / highway in Harrison, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Circle Drive Improvements Question Deadline 04/24/2025 Prospective BIDDERS may address questions to John Goedde, PE, (jgoedde@teceng.com) at 7288 Central Parke Blvd, Mason, Ohio 45040. Questions received less than seven (7) days prior to bid date cannot be answered The Contractor shall do all the work and furnish all materials, except as herein otherwise specified, necessary or proper for performing and completing the work of the Contract. The methods, materials and appliances used, therefore, must be such as will produce the quality of work specified and ensure safety to the public and property. Access to abutting properties SHALL BE MAINTAINED at all times except for temporary periods as herein stated. In the event the Contractor will be temporarily blocking the access to any property during some period of construction, he must notify all residential or business occupants at least 24 hours before said blockage to allow them time to move any vehicles in or out. INTERFERENCE WITH EXISTING STRUCTURES The Contractor shall notify, at least forty-eight (48) hours before breaking ground, the Owner and all public service corporations whose wires, pipes, conduits and other structures may be affected by his operations. He shall likewise notify the Chief of the Fire Department and Police Department of the temporary blocking of any street. RIGHTS IN THE USE OF MATERIALS FOUND ON THE PROJECT SITE Existing headwall, wingwalls and culvert pipes, as noted on the plans, are to be used by the Contractor and placed as rock channel protection as noted on the plans. Old materials not reserved by the Owner and not to be used in the work will become the property of and must be disposed of by the Contractor. CLEAN-UP DURING CONSTRUCTION The Contractor shall at all times, maintain the job site and working areas in an orderly condition, reasonably clean and free of accumulations of dirt and debris. If the Contractor fails to maintain the job site and working area in a condition satisfactory to the Owner, the Owner shall have the right to employ others to do so at the Contractor's expense. The Contractor shall be responsible for clean up prior to the end of each working day. FINAL CLEAN UP As soon as portions of the work are ready for use, they shall be thoroughly cleaned by the Contractor of all dirt and rubbish, and cleared of all materials, forms, false work, temporary structures and equipment. The Contractor shall also clean out all sewer drains, inlets, manholes and other underground lines and structures built by him or affected by his work. An attempt will be made to do so; however, only registered plan holders will be notified of expected Addendum with short preparation times. Each bidder is required to furnish with its proposal, a Bid Guaranty and Contract Bond in accordance with Section 153.54 through 153.571 of the Ohio Revised Code. Bid security, furnished in Bond form, shall be issued by a surety company or corporation licensed in the State of Ohio in the full amount of one hundred percent (100%) of the bid amount. A 100% satisfactory performance and payment bond shall be required of the successful bidder. Each bid must be submitted in a sealed envelope plainly marked on the outside with the bidder's name and address, and the name of the project for which the bid is submitted. Each bid must contain the full name of the party or parties submitting the same and all persons interested therein. All bidders must comply with the prevailing wage rates on Public Improvements in Hamilton County and the City of Harrison as determined by the Ohio Department of Commerce, Bureau of Wage & Hour Administration. The City of Harrison reserves the right to reject any or all bids, or to accept or reject any part thereof.

Post-Bid

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

19

5

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
246
Active Projects
139
Bidding Soon
2,403
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2025

May 8, 2025

Project location map

Circle Dr, Harrison, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.