BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 13, 2025 at 8:00 PM

Updated June 14, 2025

Site work and paving for a mixed-use development in Maplewood, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of June 13, 2025, the project was awarded to Park Construction Company - MN, with an awarded amount of $8,264,001.67.** City Council of Maplewood, Minnesota Will Receive Bids for the Construction of the Following Project Within the City Limits on the Basis of Payment for the Work: 2025 Maplewood Street Improvements, City Project 24-12 the Project Will Include the Following Approximate Quantities: 13,200 Cy Excavation (Material Removed From Site) 11,500 Cy Embankment Material 14,100 Ton Class 6 Aggregate Base for Streets 50,200 Sy Full Depth Reclamation 25,300 Sy Bituminous Pavement Removal 15,800 Lf Bituminous Road Pavement Saw & Seal/joint Adhesive 8,800 Gal Offsite Bituminous Fog Seal 16,000 Ton Bituminous Base & Wear Course Mixture 4,600 Sy Bituminous Driveway/trail 2,400 Sy Porous Bituminous Trail 19,600 Lf Concrete Curb and Gutter 2,100 Sy Concrete Driveway 27,000 Sy Turf Establishment (Seed/sod) 32,000 Lf Pavement Striping 6,000 Lf Storm Sewer Pipe 114 Ea Storm Sewer Structures 500 Lf Sanitary Sewer Service Repair 3,250 Lf Cipp Sanitary Sewer Lining 126 Ea Adjustment of Storm Sewer & Sanitary Sewer Castings 1,180 Lf Water Main Pipe - 4", 6", 8", 12" & 16" Dip (Open Trench) 180 Ea Water Main Anodes Bidding Information: the Project is to Begin on or About June 4, 2025, and Be Completed by November 7, 2025. Prospective Bidders Must Be on the Plan Holders List Through online for Bids to Be Accepted. Proposal is for the Furnishing of All Labor, Equipment, and Materials and Performing All Work in Connection With the Above Stated Construction and Numerous Related Work Items In Accordance With the Plans and Specifications. Planholders List, Addendums and Bid Tabulation: The Planholders List, Addendums and Bid Tabulations Will Be Available for obtain Online. Any Addendums May Also Be Distributed by Mail, Fax or Email. All Bids Must Be Accompanied by a Certified Check or Bid Bond, Payable to the City of Maplewood, Minnesota, in an Amount Equal to Five Percent (5%) of the Total Bid, Conditioned That if the Bidder is the Successful Bidder, They Will Enter Into a Contract in Accordance With Said Bid and Will Furnish Such Performance Bonds as Are Specified. No Bidder May Withdraw Their Bid for at Least 90 Days After the Scheduled Closing Time for the Receipt of Bids, Without the Consent of the Owner. Questions Any questions regarding this Technical Memorandum should be directed to Jerry Geib, Office of Materials and Road Research, at (651) 779-5937. Maplewood Public Works, Engineering Division, has designed the project. Questions before the bid date shall be directed to Tyler Strong at 651-249-2402 or Tyler.Strong@maplewoodmn.gov The City of Maplewood Reserves the Right to Reject Any or All Bids. The City of Maplewood Also Reserves the Right to Waive Any Minor Irregularities and Deviations; However, Any Bid Which Contains a Material Variance From Plans and Specifications Will Be Rejected. A Material Variance is One That Gives a Bidder a Substantial Benefit or Advantage Not Enjoyed by Other Bidders.

Award

Roads / Highways

$8,264,002.00

Public - City

Paving, Site Work

140

20

39

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
146
Bidding Soon
1,559
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2025

June 9, 2025

Project location map

Multiple Locations, Maplewood, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.