BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 23, 2025 at 8:00 PM

Updated May 24, 2025

Site work for a water / sewer project in Greenville, South Carolina. Completed plans call for site work for a water / sewer project.

ReWa is soliciting bids for Div 2 Ph 2. This project is being funded in whole or in part by the South Carolina Infrastructure Investment Program (SCIIP). All federal SCIIP requirements will apply to the contract. All contractors and subcontractors are required to be registered in the federal System for Award Management (SAM). Renewable Water Resources (ReWa) is proposing the replacement and relocation of a portion of the existing 8-inch gravity sewer system in the city of Pelzer, SC out of tightly condensed back yards into the streets to create greater accessibility for sewer maintenance and to better serve property owners. This Project includes installing approximately 835 ft of 8-inch sewer, 10 manholes, 4 service laterals, and performing all associated work including removing/abandoning existing sewer mains and manholes, installing new service lateral pipes from the main to the dwelling, installing cleanouts, and performing all other necessary work including bypass pumping, traffic control and restoration. Additionally, this Project includes two bid alternate options, in which ReWa can award either of these two options or choose to award neither. Bid Alternate 1 includes approximately 610 ft of 8-inch sewer, 6 manholes, and 5 service laterals. Bid Alternate 2 includes approximately 730 ft of 8-inch sewer, 9 manholes, and 6 service laterals. This project is being funded in whole or in part by the South Carolina Infrastructure Investment Program (SCIIP). All federal SCIIP requirements will apply to the contract. All contractors and subcontractors are required to be registered in the federal System for Award Management (SAM). Question Deadline 05/06/2025 No interpretation of the meaning of the plans, specifications, or other Contract Document will be made to any Bidder orally. Every request for such interpretation should be in writing addressed to Engineer and, to be given consideration, must be received at least ten (10) days prior to the date fixed for the opening of Bids. Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the specifications which, if issued, will be posted on the online

Bid Results

Water / Sewer

$2,343,894.00

Public - County

Site Work

17

13

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
76
Bidding Soon
1,161
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2025

July 15, 2025

Project location map

Multiple Locations, Greenville, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.