Site work for a bridge / tunnel in Wenatchee, Washington. Completed plans call for site work for a bridge / tunnel.

Chelan County Natural Resources requests sealed Bid Proposals in accordance with the " Instruction to Bidders " as contained in the Bid Documents for the McCrate Culvert Replacement Project located in Chelan County, Washington. Chelan County Natural Resources Project: McCrate Culvert Replacement Project, Chelan County, WA. This Contract provides for the removal of a 4-foot by 20-foot CMP Culvert and installation of 40-foot-long by 14-foot-wide prefabricated steel bridge structure near river-mile 0.4 on Eagle Creek. This work includes but it not limited to: installation, maintenance and restoration of temporary construction access routes and staging areas; installation of various sized plants post construction; procurement or concrete forming and pouring for the bridge footings and stem walls; temporary traffic control as needed to safely deliver, handle, and stage equipment and materials; structure, channel, and roadway excavation; in-water-work requiring site isolation, temporary diversion of streamflow, shoring and dewatering as necessary; temporary erosion and sediment control; procurement, and installation of the new crossing structure and associated wingwalls and back walls; streambed and bank restoration; construction surveying required to perform the aforementioned tasks; and all other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the WSDOT Standard Specifications for Road, Bridge and Municipal Construction and addenda thereto. All onsite work shall occur between the dates of October 1st and October 31st, 2025. The estimated range of probable cost is $211,000-$233,000 excluding WSST The office responsible for answering all questions regarding these bid documents and to show the project to prospective bidders is: Contracting Agency: Chelan County Natural Resources Department411 Washington St., Suite 201 Wenatchee, WA 98801 Contracting Officer Hannah Pygott Chelan County Natural Resources Department 411 Washington St., Suite 201 Wenatchee, WA 98801 Phone: 509-670-9306 Email: hannah.pygott@co.chelan.wa.us Project Manager: Stephen Lesky County Natural Resources Department 411 Washington St., Suite 201 Wenatchee, WA 98801 Phone: 509-670-8094 Email: Stephen.Lesky@co.chelan.wa.us Project Engineer: Patrick Powers Waterfall Engineering LLC Phone: 360-701-8433 Email: waterfallengineering@comcast.net *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All questions during the bid process should be submitted to Hannah Pygott

Bid Results

Bridges / Tunnels

$218,464.00

Public - County

Site Work

13

7

2

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
28
Bidding Soon
224
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 27, 2025

October 23, 2025

Project location map

Eagle Creek road, Wenatchee, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.