BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 14, 2026 at 7:00 PM

Updated January 15, 2026

Renovation of a water / sewer project in Carson, California. Completed plans call for the renovation of a 2,000-square-foot, one-story above grade water / sewer project.

Project involves renovation of approximately 2,000 sf of existing lab/office/storage spaces on the northern side of the east laboratory building. These spaces will be developed into two new biosafety level (BSL) laboratory spaces. The work to be performed includes construction of suitable architectural finishes, new HVAC system, flooring, laboratory equipment, electrical, mechanical, security, and plumbing fixtures for developing BSL2+ and BSL3 laboratory spaces. Question Deadline 01/06/2026 at 3:00 PM PT The Board of Directors may award the contract for the above described work, either at the meeting of the Board of Directors to be held at the above-stated address, on February 11, 2026 beginning at 1:30 p.m., or at any other meeting of the Board of Directors within 90 days after the date listed above for receipt of bids. The Board of Directors may reject all bids. Unless all bids are rejected, award will be made to the low, responsive, responsible bidder. The work of construction must be completed within 340 WORKING DAYS after the date in the Notice to Proceed. Est. Value Notes: 5,000,000 - 6,700,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work to be performed under the provisions of these Contract Documents consists of furnishing all materials, equipment and tools, the performance of all necessary labor, and the construction complete, including all work appurtenant thereto, for the construction of the Los Angeles County Sanitation District AK Warren Resource Facility East Laboratory Building Biosafety Improvements located at 24504 S. Figueroa Street, Carson, CA 90745. The work includes, but is not necessarily limited to, the following: renovation of approximately 2,000 SF of existing laboratories on the northern side of the East lab building. These spaces will house a new BSL-2+ laboratory and a new BSL-3 laboratory; and all other appurtenant work as shown in the Drawing set and as specified in these Special Provisions nd the Standard Specifications. Renovation of Approximately 2000 Sf of Existing Lab/office/storage Spaces on the Northern Side of the East Laboratory Building. These Spaces Will Be Turned Into Two New Bsl-2+ & Bsl-3 Laboratory Spaces. The Scope Includes, but is Not Limited to, New Suitable Finishes, Modular Casework, Improved Single Pane Windows,new Doors & Frames,relocation of Existing Utility Floor Hatches, New Air Handling Unitsand Exhaust Fans on the Roof, New Air Cooled Chiller, New Heat Recovery Chiller Unit on the Roof, Replacement of Existing Pumps, New Electrical Panel Boards, New Diesel Generator, New Ups System, as Well as Structural Shear Wall Modifications to Accomodate New Proposed Layouts.

Bid Results

Water / Sewer

$6,629,478.00

Public - County

Renovation

125

30

2

5

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
2
Bidding Soon
2,012
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2026

April 1, 2026

Project location map

24501 S Figueroa St, Carson, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.