Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 14, 2026 at 7:00 PM
Updated January 15, 2026
Renovation of a water / sewer project in Carson, California. Completed plans call for the renovation of a 2,000-square-foot, one-story above grade water / sewer project.
Project involves renovation of approximately 2,000 sf of existing lab/office/storage spaces on the northern side of the east laboratory building. These spaces will be developed into two new biosafety level (BSL) laboratory spaces. The work to be performed includes construction of suitable architectural finishes, new HVAC system, flooring, laboratory equipment, electrical, mechanical, security, and plumbing fixtures for developing BSL2+ and BSL3 laboratory spaces. Question Deadline 01/06/2026 at 3:00 PM PT The Board of Directors may award the contract for the above described work, either at the meeting of the Board of Directors to be held at the above-stated address, on February 11, 2026 beginning at 1:30 p.m., or at any other meeting of the Board of Directors within 90 days after the date listed above for receipt of bids. The Board of Directors may reject all bids. Unless all bids are rejected, award will be made to the low, responsive, responsible bidder. The work of construction must be completed within 340 WORKING DAYS after the date in the Notice to Proceed. Est. Value Notes: 5,000,000 - 6,700,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work to be performed under the provisions of these Contract Documents consists of furnishing all materials, equipment and tools, the performance of all necessary labor, and the construction complete, including all work appurtenant thereto, for the construction of the Los Angeles County Sanitation District AK Warren Resource Facility East Laboratory Building Biosafety Improvements located at 24504 S. Figueroa Street, Carson, CA 90745. The work includes, but is not necessarily limited to, the following: renovation of approximately 2,000 SF of existing laboratories on the northern side of the East lab building. These spaces will house a new BSL-2+ laboratory and a new BSL-3 laboratory; and all other appurtenant work as shown in the Drawing set and as specified in these Special Provisions nd the Standard Specifications. Renovation of Approximately 2000 Sf of Existing Lab/office/storage Spaces on the Northern Side of the East Laboratory Building. These Spaces Will Be Turned Into Two New Bsl-2+ & Bsl-3 Laboratory Spaces. The Scope Includes, but is Not Limited to, New Suitable Finishes, Modular Casework, Improved Single Pane Windows,new Doors & Frames,relocation of Existing Utility Floor Hatches, New Air Handling Unitsand Exhaust Fans on the Roof, New Air Cooled Chiller, New Heat Recovery Chiller Unit on the Roof, Replacement of Existing Pumps, New Electrical Panel Boards, New Diesel Generator, New Ups System, as Well as Structural Shear Wall Modifications to Accomodate New Proposed Layouts.
Bid Results
Water / Sewer
$6,629,478.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 13, 2026
April 1, 2026
24501 S Figueroa St, Carson, CA
Related To This Project
Carson, CA
Bid Date: Nov 10 2025
Carson, CA
Bid Date: Apr 24 2025
Carson, CA
Bid Date: May 22 2025
Carson, CA
Bid Date: Jan 09 2026
Carson, CA
Bid Date: Apr 26 2019
Carson, CA
Bid Date: Jun 12 2025
Carson, CA
Bid Date: May 19 2025
Carson, CA
Bid Date: Apr 24 2025
Carson, CA
--
Carson, CA
--
Carson, CA
Bid Date: Mar 01 2019
Carson, CA
Bid Date: May 22 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
