BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2025 at 8:00 PM

Updated June 28, 2025

Site work for a water / sewer project in Chula Vista, California. Completed plans call for site work for a water / sewer project.

Sweetwater Authority (Authority) was formed in 1977 as a joint-powers agency between the City of National City and the South Bay Irrigation District. Governed by a seven-member Board of Directors, the Authority is a publicly-owned water agency that serves potable water to a population of approximately 200,000 in the City of National City, the western portion of the City of Chula Vista, and the unincorporated areas of Bonita and Lincoln Acres in San Diego County, CA. The Authority's service area covers approximately 36 square miles. All provisions of law applicable to public contracts will be made part of the final contract to the same extend as though set forth herein, and will be complied with by the successful bidder. Sweetwater Authority encourages participation by local, small, and/or disadvantaged businesses. THE DESIRED SERVICE This Request for Quote (RFQ) is inviting companies to submit a Bid for the purchase and installation of a stainless-steel vertical turbine pump in a brackish groundwater well. The existing pump has been removed and cannot be repaired. Your bid should include all costs for materials, labor, freight, and taxes required to complete the project as outlined below. The selected contractor will need to sign the Authority's standard Purchase Order Terms and Conditions. Any exceptions to the Terms and Conditions should be noted in your bid. Please ensure that all services adhere to the bid pricing for each project and comply with the Terms and Conditions. SCOPE OF WORK Question Deadline 04/29/2025 at 3:00 PM PT The scope of work for the rehabilitation of NC Well No. 3 entails extracting the pump equipment, performing a full chemical rehabilitation and airlift, and inspecting all removed equipment to report findings and determine necessary repairs. This also includes video logging the well before and after rehabilitation, reinstalling the equipment, performing startup tests, and assessing the system operation. The scope of work for the procurement and installation of the well pump at San Diego Formation Well No. 11 (SDF Well No. 11) includes the following: _ Mobilization and Demobilization _ Procure a new Goulds 13CHC stainless steel vertical turbine bowl assembly _ Cut and re-thread column pipe and shafting to match the new column lengths. Note that the shafts will be reused. _ Replace 17 couplings with phenolic lining. _ Recondition and phenolic line 15 couplings. _ Replace the head nipple in the discharge head. _ Replace shaft retainers and inserts. _ Recondition the mechanical seal and seal gland. _ Install the pump equipment.

Bid Results

Water / Sewer

$152,069.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
82
Bidding Soon
897
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2025

May 29, 2025

Project location map

To Be Determined, Chula Vista, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.