Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 29, 2025 at 8:00 PM
Updated July 22, 2025
Site work for a water / sewer project in Dallas, Texas. Design plans call for site work for a water / sewer project.
Plans call for Delta Pump Station Construction including replacement and rehabilitation of Delta Pump Station with two high-flow pumps, pump house and sump. The existing 700HP pumps will be replaced with pumps of equal capacity capable of pumping 40,000 gallons per minute with a total dynamic head of 46.4 ft., significantly increasing operational efficiencies and providing enhanced flood protection to the West Dallas community. As of April 29, 2025, design anticipated to begin in late June or early July 2025. Construction is slated to begin early 2026 with completion date of late 2027.
Design
Water / Sewer
$26,381,300.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
