BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 7, 2025 at 8:00 PM

Updated July 8, 2025

Site work and paving for a road / highway in Peru, Massachusetts. Working plans call for site work for a road / highway; and for paving for a road / highway.

Full-depth Reclamation and Paving in Sunrise Village; and 20% Asphalt Rubber on Middlefield Rd MassDOT prequalification of contractors. The Town of Peru is an Equal Opportunity/Affirmative Action Employer. All bids for services are subject to the prevailing wage rates as per Mass. General Laws Chapter 149, Section 26 to 27F inclusive and Chapter 30, Section 39M, and a 5% bid deposit is required, in the form of a bid bond or certified check, unless specified in the bid package. The Town of Peru, the awarding authority reserves the right to accept or reject any or all bids in total or in part or waive any informality in the proposals as they deem in the best interest of the public. The Contractor shall furnish all labor, materials, equipment and insurance to perform all work required for the project known as the - Project, in strict accordance with the Contract Documents and all related Drawings and Specifications. The said Documents, Specifications, Drawings and any GENERAL SUPPLEMENTARY CONDITIONS are incorporated herein by reference and are made a part of this Agreement. Direction of the Work: The Contractor shall supervise and direct the Work, using his best skills and attention which shall not be less than such state of skill and attention generally rendered by the contracting profession for projects similar to the Project in scope, difficulty and location. The Contractor shall maintain adequate supervisory personnel at the project site during the performance of the Work. He shall be solely responsible for all construction means, methods, techniques, Questions Due: May 1, 2025, 4:00pm Questions shall be submitted via Town's e-Procurement Portal Question & Answer feature by 4:00 pm on Thursday, May 1, 2025 in order to allow all bidders time to incorporate answers into their bids. Note that oral communications are not binding on the Town and only written responses by the Town will be considered Sunrise Village consists of Hilltop Rd, Rita Rd, Bonny Ln and David Dr. Sunrise village was once a private development with gravel roads that were accepted by the town on January 4, 1992. Peru received a Community Development Block Grant in December of 1995. The grant funds were used to add drainage and culverts to the road. When the job was complete all 4 roads were blacktopped

Final Planning

Roads / Highways

$104,856.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
3
Bidding Soon
1,639
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2025

August 4, 2025

Project location map

Multiple Locations, Peru, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.