Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 10, 2025 at 8:00 PM
Updated July 11, 2025
Renovation of a fire / police facility in Village of Wellington, Florida. Completed plans call for the renovation of a fire / police facility.
Replace four (4) overhead bay doors Palm Beach County reserves the right to waive any bid irregularities, informalities, or technical deficiencies and to reject any and all quotes/bids. Question Deadline 05/22/2025 Questions must be e-mailed to FDO-CID-Bids@pbc.gov The work covered by this Request for Quote consists of the furnishing of all labor, equipment, devices, tools, materials, transportation, professional services, supervision, drawings, permitting, and all miscellaneous requirements to perform all operations necessary to accomplish the work set forth below and shall be considered part of the Scope of Work. b. Please reference the Annual Contract - Overhead Door for additional requirements. c. Work to be completed during the hours of 7:00 a.m. to 5:00 p.m., Monday through Friday. d. Contractor shall contact the Project Manager within seventy-two (72) hours of notice to proceed to establish scheduling, etc. required for project implementation. e. Work to be completed within one hundred twenty (120) calendar days from Notice to Proceed. Permit application, if required, is to be submitted by Contractor within five (5) days of "Notice to Proceed" and due diligence exercised to address a l Building Department comments. f. Liquidated damages will accrue in the amount of $120 per day. g. The Contractor will provide a Certificate of Occupancy or Certificate of Completion, as appropriate, obtained from the proper Building official, prior to processing of final payment. h. Contractor is responsible for obtaining all measurements during the site inspection 2. SCOPE OF WORK To replace four (4) overhead bay doors per the project requirements provided below and Exhibits "1" - "6": a. Furnish and install four (4) new overhead bay doors. Doors shall be Stormtite 625 Series Insulated Service Door (or PBC approved equal), as referenced in Exhibit "1". b. Reference Exhibits "1" - "6" for replacement requirements. c. Execute work in a manner to protect adjacent equipment and other existing items against damage. Page 1 of 4 d. Disconnect electrical power, entrapment protection, push-button and remote control connections. e. Properly remove four (4) overhead doors; assembly to include panels, track, rollers, motor, torsion shaft assembly, trolley and push-button controls. All removed components shall be properly disposed of away from the property each day. f. Install new overhead door assembly to include new track, rollers, operating motor, and trolley assembly, torsion shaft assembly with new spring, hinges, and fixtures. Reference Exhibit "2". g. Connect power supply, all push button controls to the corresponding door. Install and connect new remote control units and install entrapment protection assemblies. h. Coordinate installation of electrical service. Complete power and control wiring from disconnect to unit components. i. The master (emergency) lift button on the wall must be connected to all doors for emergency engine response as it is now. This must be tested after each new door is installed. 1. Bay Doors (Basis of Design) a) Heavy duty angle guides b) Interior chain c) Round hood d) 100,000 cycle springs e) Heavy duty bearings f) Dade (TDI) 65psf wind load 24ga slats g) Slide bolt lock h) Powder coating complete door - color - RAL3002 - 38/30002 2. Operator - RHX _hp Heavy Duty Operator (Basis of Design) a) Monitored edge interface module b) Front/top of hood, rolling steel mounting kit c) Timer close module d) Photo eye NEMA 4X rated retro-reflective e) Auxiliary input/output module f) 3-button open/close/stop push button control box 3. Safety Devices (Basis of Design) a) Macurco CM-6 Carbon Monoxide detector b) Macurco TX-6-ND Nitrogen Dioxide detector c) Door Monitoring laser beam d) Photo eye e) Reversing bottom safety edge f) Zero strike LED lights 4. Remote & Receiver (Basis of Design) a) Linear Delta 3 series digital receiver b) Linear Delta 3 transmitter
Award
Fire / Police
$142,940.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 29, 2025
June 30, 2025
1000 Greenview Shores Blvd, Village of Wellington, FL
Related To This Project
Village of Wellington, FL
Bid Date: May 02 2025
Village of Wellington, FL
Bid Date: Jan 06 2021
Village of Wellington, FL
Bid Date: Dec 09 2020
Village of Wellington, FL
Bid Date: Oct 07 2020
Village of Wellington, FL
Bid Date: Oct 07 2020
Village of Wellington, FL
Bid Date: May 28 2025
Village of Wellington, FL
Bid Date: May 22 2025
Village of Wellington, FL
Bid Date: Jul 02 2025
Village of Wellington, FL
--
Village of Wellington, FL
Bid Date: Apr 22 2025
Village of Wellington, FL
Bid Date: May 08 2025
Village of Wellington, FL
Bid Date: Apr 04 2025
Village of Wellington, FL
--
Village of Wellington, FL
Bid Date: Apr 06 2025
Village of Wellington, FL
Bid Date: Apr 16 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
