BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2025 at 8:00 PM

Updated June 7, 2025

Site work and paving for a sidewalk / parking lot in Coon Rapids, Minnesota. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of June 6, 2025, the project was awarded to Ebert Companies, with an awarded amount of $242,678.62.** Remove Concrete Driveway Pavement (Base Bid) 12,800 SQ FT 8" Reinforced Concrete Pavement (Base Bid) 12,800 SQ FT Remove Curb & Gutter (Alternate Bid) 300 LIN FT Concrete Curb & Gutter Hand Placed (Alternate Bid) 300 LIN FT Remove Concrete Walk (Alternate Bid) 450 SQ FT 4" Concrete Walk (Alternate Bid) 320 SQ FT 6" Concrete Ped Ramp (Alternate Bid) 130 SQ FT Sawing Bituminous Pavement (Alternate Bid) 160 LIN FT Type SP 9.5 Wearing Course For Patching (Alternate Bid) 20 TON Neither the Owner or the Engineer will give verbal answers to inquiries regarding the meanings of drawings and specifications, or verbal instructions previous to the Award of Contract. Any explanation desired by bidders must be requested from the Engineer in writing, and if explanation is necessary, a reply will be made in the form of an addendum, a copy of which will be forwarded to each bidder who has received a set of Contract Documents. All addenda issued to bidders prior to date of receipt of proposals shall become a part of the Contract Documents, and all proposals are to include the work therein described. Each proposal submitted shall list all addenda by number which have been received prior to the time scheduled for receipt of proposals. If the Contract is awarded by the City Council on May 20, 2025, it is anticipated that construction on this Contract could begin on August 4, 2025. The timeframe for construction of this project is between August and September 2025. The project includes removal of existing concrete driveway and parking lot materials at Fire Station #2 (1199 121 st Avenue NW) and replacement with 8-inches of new reinforced concrete pavement. A pre-construction meeting will be held onsite at Fire Station #2 to discuss project phasing and schedule before any work begins. The Contractor shall be given until September 19, 2025 (Final Completion) to complete all work on this project. Final completion is defined as all concrete pavement materials have been completed. REPLACEMENT OF EXISTING CONCRETE DRIVEWAY & PARKING LOT AT FIRE STATION #2 (1199 121 ST AVENUE NW) The bids will be considered by the City Council on Tuesday, May 20, 2025.

Award

Sidewalks / Parking Lot

$242,679.00

Public - City

Paving, Site Work

9

7

7

6

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
294
Active Projects
182
Bidding Soon
1,549
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2025

August 4, 2025

Project location map

To Be Determined, Coon Rapids, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.