BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2025 at 8:00 PM

Updated June 21, 2025

Site work and paving for a mixed-use development in Grand Rapids, Michigan. Completed plans call for site work for a sidewalk / parking lot; sidewalk / parking lot; transportation facility; and water / sewer project.

The project consists of furnishing all material and constructing the following: Construct an expansion of the Airport Viewing Parking including approximately 585 tons of hot mix asphalt, 12,650 square feet of concrete sidewalk, 15,350 cubic yards of embankment, 3,100 square yards of aggregate base, 1,100 square years of aggregate surface course, 1,350 cubic yards of subbase, miscellaneous storm sewer and underdrain, eight power pedestals and an electrical panel, pavement marking, signage and restoration. Including all necessary appurtenances and restoration. The work to be performed under this contract will be financed and paid for by funds received from local funds. A bid bond, certified check, or cashier's check payable to Gerald R. Ford International Airport Authority in an amount equal to five percent (5%) of the total price shall accompany each bid. This surety shall bind the bidder for a period of Thirty (30) days after the receipt of bids. Question Deadline 05/07/2025 DISADVANTAGED BUSINESS ENTERPRISE (DBE) GFIAA encourages and solicits participation of qualified minority and women businesses consistent with the principle of utilizing the most highly qualified and competitive firms. The Owner reserves the right to reject any or all bids and to waive any irregularities in bidding. No bid may be withdrawn after the scheduled closing time for receiving bids for at least ninety (90) days thereafter. Phase 1 of the project shall be substantially completed by June 27, 2025. Doc Notes: Contract documents will be delivered electronically and are also available at the offices of: Gerald R. Ford International Airport Authority, 5500 44 th Street SE, Grand Rapids, MI 49512 Prein&Newhof, 3355 Evergreen Drive NE, Grand Rapids, MI 49525 And some local plan rooms. Drawings and specifications are available online or at the 3355 Evergreen Drive NE, Grand Rapids, MI 49525 office of Prein&Newhof after 12:00 pm, Friday, April 18, 2025. Electronic drawings, specifications and bidding documents will be accessible/available only to those Bidders who have contacted the Gerald R. Ford Airport Purchasing Department. Bidder assumes sole risk for any project specifications and drawings, electronic or hard copy, obtained other than directly from the Gerald R. Ford International Airport or Prein&Newhof.

Award

Transportation Terminals

$714,513.00

Public - County

Paving, Site Work

14

12

17

5

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
55
Bidding Soon
1,251
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2025

June 12, 2025

Project location map

4820 Kraft Ave SE, Grand Rapids, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.