BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 21, 2025 at 8:00 PM

Updated May 23, 2025

Site work and paving for a civil project in Rockford, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Interstate Diversion Basin Trunk Upsizing FPCIP 150D project consists of removal and replacement of sanitary sewer pipe and manholes, new alignment of sanitary sewer a manholes, sanitary sewer and manhole abandonment, boring and jacking casing pavement removal and replacement, aggregate surface placement, and all other appur as indicated on the plans and in the specifications. Instructions to Bidders 3.8 re rents for Statement of Qualifications. Bidder must have a permanent business office forty (40) miles of FRSA's office at 3501 Kishwaukee Street in Rockford, Illinois. All demolition, construction, installation and associated Project wo be completed by August 1, 2026. Liquidated damages shall be $300.00 per calender day. Bid Bond form with an acceptable Bid Security attached, in the amount percent (5%) of the total bid price. This amount is a guarantee that, if the Proposal accepted, a Contract will be entered into and its performance properly secured. The successful will be required to furnish a satisfactory Performance Bond in the full amount of Bid or Proposal. No Bid shall be withdrawn without FRSA's consent for a periods sixty (60) days after the scheduled closing time for receipt of bids. serves the right to reject any or all bids, or any part thereof, or to accept any bid or any thereof, or to waive any formalities in any bids, deemed to be in the best interest of FRSA. Each Proposal must be accompanied by the FRSA Bid Bond form with an acceptable Bid Security attached, in the amount specified in Article One, Notice to Bidders. This sum is a guarantee that, if the Proposal is accepted, a contract will be entered into and its performance properly secured. The FRSA's Bid Bond Form included in the bid packet must be used. No other Bid Bond form may be substituted. Within ten (10) days after the opening of bids, the deposits of all but the three lowest bidders will be returned. The deposits of the remaining two unsuccessful bidders will be returned within three (3) days after the execution of the Contract, or, if no such Contract has been executed, within sixty (60) days after the date of opening bids. The deposit of the successful bidder will be returned only after he has duly executed the Contract and furnished the required bond and insurance. The Contractor shall provide a Performance Bond and Labor & Materials Payment Bond form acceptable to FRSA. The performance bond shall be for either 100% of the contract price or for the Contractor's unit price times the estimated number of units, as applicable. Question Deadline 05/06/2025 Every request for such interpretation must be in writing addressed to Four Rivers Sanitation Authority, 3501 Kishwaukee Street, Rockford, Illinois To be given consideration, such request must be received atleastfive (5) days priorto the date fixed for the opening of bids.

Bid Results

Water / Sewer

$7,922,554.00

Public - City

Paving, Site Work

42

8

2

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
536
Active Projects
297
Bidding Soon
3,907
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2025

June 12, 2025

Project location map

Multiple Locations, Rockford, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.