BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 22, 2025 at 8:00 PM

Updated April 23, 2025

This is a service / maintenance or supply contract in Durham, North Carolina. Contact the soliciting agency for additional information.

The Triangle West Transportation Planning Organization is seeking consultant services to conduct a Feasibility Study to determine the feasibility of converting +/-10.8 miles of the J Branch rail line (also referred to as the Co-Gen rail line) to a multimodal/multi-use trail. The trail should build upon the existing pedestrian/bike routes, bus transit and local streets to create connections that provide alternatives to single occupancy car trips for commuters, opportunities for recreation and create local and regional tourism destinations. As part of the scope of services, the consultant will identify the highest and best reuse of the rail line for a greenway, which could include bicycle and pedestrian trails with or without an adjacent transit component such as light rail or popup railway or other appropriate passenger vehicle type. This trail will connect downtown Carrboro through suburban western Chapel Hill to the southeast rural area of Orange County, and so the trail project should be conceived of as a connecting element serving differing populations with different needs. The primary and/or subconsultant firm(s) must be pre-qualified by the Department to perform any combination of the Discipline Codes listed below for Central Pines Regional Council. The Department maintains on file the qualifications and key personnel for each approved discipline, as well as any required samples of work. Each year on the anniversary date of the company, the firm shall renew their prequalified disciplines. If your firm has not renewed its application as required by your anniversary date or if your firm is not currentl prequalified, please submit an application to the Department prior to submittal of your LOI Proposed Contract Time: August 2025 to June 30, 2026 All submissions, correspondence, and questions concerning this RFLOI should be directed to: David Miller, Triangle West TPO Transportation Planner, at david.miller@twtpo.orgQuestions must be submitted to the person listed above no later than Friday, May 2, 2025 by 2:00 p.m. The last addendum will be issued no later than Wednesday, May 7, 2025. The method of Contractor Selection has not been Determined at this time. NCDOT - RFP - UNC Co-Gen Rail Corridor Feasibility Study

Conceptual

Sidewalks / Parking Lot

$500,000.00

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
244
Active Projects
145
Bidding Soon
1,731
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2025

Project location map

Multiple Locations, Durham, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.