BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 21, 2025 at 8:00 PM

Updated May 22, 2025

Site work and paving for a mixed-use development in Murray, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project includes two project schedules the first, containing approximately 1,620 SF of new sidewalk, 148,536 SF of mill, and 2,844 Tons of bituminous overlay of 500 West. Included in the first phase is the rehabilitation of the 500 West Bridge over Big Cottonwood Creek. The second containing approximately 2700 SF of new sidewalk, 317,357 SF of mill, and 6030 Tons of bituminous overlay of Murray Boulevard. Also included in both schedules are pedestrian ramp improvements, pavement striping, and spot replacement of curb and gutter, sidewalk, drive approach and waterway. Question Deadline 04/28/2025 at 12:00 PM MT Online Portal

Award

Roads / Highways

$1,573,410.00

Public - City

Paving, Site Work

23

11

11

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
62
Bidding Soon
1,020
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2025

July 1, 2025

Project location map

500 Murray Blvd, Murray, UT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.