BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 15, 2025 at 8:00 PM

Updated May 16, 2025

Site work and paving for a road / highway in Millen, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following: Resurfacing approximately 6.45 miles of Speedy Sapp Road and Gays Hill Church Road. The Contractor shall provide milling, 4" deep patching, bituminous tack coat, leveling, striping, and traffic control. Time allotted for final completion of work is one hundred fifty (150) calendar days. Question Deadline 05/14/2025 All questions about the meaning or intent of the Bidding Documents are to be directed to Engineer Questions received less than seven (7) calendar days prior to the date for opening of Bids may not be answered Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than 10% of the base bid. All bonds shall be by a surety company licensed in Georgia with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability". Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond. No bid may be withdrawn after the closing time for the receipt of bids for a period of thirty (30) days. Owner reserves the right to reject any or all Bids and to waive informalities, including without limitation, the rights to reject any or all nonconforming, non-responsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owne

Bid Results

Roads / Highways

$1,115,700.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
55
Bidding Soon
827
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2025

June 13, 2025

Project location map

Multiple Locations, Millen, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.