Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 1, 2025 at 8:00 PM
Updated July 2, 2025
Site work and paving for a road / highway in River Hills, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Questions received less than seven days prior to the date for opening of Bids may not be answered. If there are any questions concerning this project plan, manual and specifications, Please Contact: Brad Jors, P.E. @ 414-751-7235 bjors@kapurinc.com The work under this contract includes: The project is located on N. Green Tree Court, from W. Green Tree Road to the cul-de-sac, on N. River Road, from W. Bradley Road to W. Dean Road, and the asphalt pathway located on the north side of W. Green Tree Road beginning at the Green Tree Bridge over the Milwaukee River and terminating west of the Green Tree Bridge over I-43. A brief description of the major work items for the above contract includes: The project consists of approximately 4,800 linear feet of road rehabilitation and approximately 2,200 linear feet of pathway reconstruction. Major work items and approximate quantities include: 13,200 square yards of asphaltic milling, 3,275 tons of HMA Pavement, and 2,650 square yards of lawn restoration. The project consists of approximately 4,800 linear feet of road rehabilitation and approximately 2,200 linear feet of pathway reconstruction. Major work items and approximate quantities include: 13,200 square yards of asphaltic milling, 3,275 tons of HMA Pavement, and 2,650 square yards of lawn restoration. The work includes furnishing of all materials and equipment and performance of the following work,per the Plans, Specifications and Contract Documents (PS & CD). The project is located on N.Green Tree Court, from W. GreenTree Road to the cul-de-sac, on N.River Road, from W. Bradley Road to W. Dean Road, and the asphalt pathway located on the north sideof W. Green Tree Road beginning at the Green Tree Bridge over the Milwaukee River and terminating west of the Green Tree Bridge over I-43. A brief description of the major work items for the above contract includes:The project consists of approximately 4,800 linear feet of road rehabilitation and approximately2,200 linear feet of pathway reconstruction. Major work items and approximate quantities include:13,200 square yards of asphaltic milling, 3,275 tons of HMA Pavement, and 2,650 square yards of lawn restoration. All Bids shall be accompanied by Bid Security in the form of a Bid Bond, payable to the Village of River Hills, in the amount equal to five percent of the bid. Prospective bidders must be on the plan holders list through online for bids to be accepted. Prospective bidders must be prequalified to submit a bid, see Instructions to Bidders.Bidders may not withdraw their bid within the 90-day period after the date of the bid opening. The Owner reserves the right to reject any or all bids, waive or not waive any informality in the bids received and to accept any proposal, which they deem most favorable to the interests of the Owner
Award
Roads / Highways
$455,612.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 5, 2025
July 1, 2025
Multiple Locations, River Hills, WI
Related To This Project
River Hills, WI
Bid Date: Feb 27 2025
River Hills, WI
Bid Date: Apr 23 2024
River Hills, WI
Bid Date: Mar 06 2024
River Hills, WI
Bid Date: Dec 17 2021
River Hills, WI
Bid Date: Feb 24 2022
River Hills, WI
--
River Hills, WI
Bid Date: Mar 23 2023
River Hills, WI
Bid Date: Jan 26 2023
River Hills, WI
Bid Date: Apr 04 2023
River Hills, WI
Bid Date: Sep 15 2022
Eau Claire, WI
Bid Date: May 14 2025
Milwaukee, WI
Bid Date: May 09 2025
Marshall, WI
Bid Date: May 09 2025
Shell Lake, WI
Bid Date: May 12 2025
Park Falls, WI
Bid Date: May 12 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
