BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2025 at 8:00 PM

Updated July 17, 2025

Site work and paving for a civil project in Miami, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

General Engineering; General Building Contractor; Underground Utility/ Excavation; Paving SCOPE OF WORK: This Project consists of furnishing all labor, materials and equipment (except as specifically stated to be furnished by the Department) to adjust water main and fire hydrant valve boxes, sanitary sewer manholes, water valve manholes, sewer force main valve boxes, install fire hydrant guard post, construct concrete slab for fire hydrants, compact and install new pavement to the square around the casting with hot mix asphalt and complete all associated work, as ordered by the Department, during a 1.5-year period beginning on the date of the Notice to Proceed. The Contractor must certify that he has at least two installation crews and equipment available to complete the work in a timely fashion. The project consists of performing these repairs at locations anywhere within the limits of Miami-Dade County, Florida. The work includes, but shall not be limited to, adjustment of valve boxes for both water and sewer valves; adjustment of manhole castings for gravity sewers and air release valves; demolition and removal of existing asphalt and concrete; constructing new 8-inch thick concrete around the casting; furnishing and installing bricks for the adjustment; restoration of the flag area around the casting; furnishing and installing hot mix asphalt to match existing; traffic control; locating valve boxes and manholes buried under dirt or asphalt; obtaining all required permits; and all other miscellaneous and appurtenant items necessary to perform a complete restoration. The original Bid bond Security (in the form of a bid bond or cashier’s check) MUST be delivered to WASD, at the address above, BEFORE the bids are opened. Failure to deliver the original will result in the bid submission being rejected as non-responsive. The RFI cut-off date is five (5) business days prior to the bid due date. Contractor must refer to the Request for Price Quotation (RPQ) and associated project documents for the detail Scope of Work. The Contractor further proposes and agrees to begin the work with an adequate force and with sufficient equipment and facilities on the date stated in the written Notice to Proceed issued and served upon him by the Engineer and to complete the work in Five Hundred Forty (540) Consecutive Calendar Days to complete all work orders Work Orders issued.

Award

Water / Sewer

$966,654.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
2
Bidding Soon
1,165
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.