BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 5, 2025 at 8:00 PM

Updated June 6, 2025

Site work for a water / sewer project in Alton, Illinois. Working plans call for site work for a water / sewer project.

Sources Sought Notice to identify potential System for Award Management (SAM) Database registered businesses that are interested and capable of performing Melvin Price Lock and Dam Tainter Gates 4 and 5 Admiralty Repairs. SEE ATTACHMENT FOR FULL DETAILS. PERIOD OF PERFORMANCE: 580 days after date of award ESTIMATED MAGNITUDE: between $1,000,000 and $5,000,000 General Site Description: Melvin Price Locks and Dam is located on the Mississippi River near Alton, Illinois, approximately 21.3 river miles upstream from St. Louis and 200.8 miles above the mouth of the Ohio River. The project consists of a main lock and an auxiliary lock; a dam containing nine Tainter gates; and a fixed submersible dike reaching the Missouri Side of the River. The main lock is 1200 ft by 110 ft with a lift gate at the upstream end and a miter gate at the downstream end of the lock chamber. The auxiliary lock is 600 ft by 110 ft with a set of miter gates at the upstream and downstream end. Work Statement: The work will consist of furnishing all labor, equipment, operators, supervision, supplies and materials, and incidentals necessary to perform the Melvin Price Locks & Dam Tainter Gate Repairs. The work is anticipated to be accomplished with traditional river marine construction equipment such as floating plant, barge mounted crane, spud barge(s) and staged downstream of Tainter Gates four and five. The structural work on the project includes but is not limited to the following: - Removal and disposal of existing damaged areas and structural steel members on the identified tainter gates. - Preparation and installation of various structural steel members and large skin plate sections via floating plant. Contractor must be able to perform work in accordance with AWS D1.1. - Application of 5-E-Z coating system on repaired areas via floating plant. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Water / Sewer

$5,000,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
95
Bidding Soon
1,377
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2025

Project location map

To Be Determined, Alton, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.