Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 5, 2025 at 8:00 PM
Updated June 6, 2025
Site work for a water / sewer project in Alton, Illinois. Working plans call for site work for a water / sewer project.
Sources Sought Notice to identify potential System for Award Management (SAM) Database registered businesses that are interested and capable of performing Melvin Price Lock and Dam Tainter Gates 4 and 5 Admiralty Repairs. SEE ATTACHMENT FOR FULL DETAILS. PERIOD OF PERFORMANCE: 580 days after date of award ESTIMATED MAGNITUDE: between $1,000,000 and $5,000,000 General Site Description: Melvin Price Locks and Dam is located on the Mississippi River near Alton, Illinois, approximately 21.3 river miles upstream from St. Louis and 200.8 miles above the mouth of the Ohio River. The project consists of a main lock and an auxiliary lock; a dam containing nine Tainter gates; and a fixed submersible dike reaching the Missouri Side of the River. The main lock is 1200 ft by 110 ft with a lift gate at the upstream end and a miter gate at the downstream end of the lock chamber. The auxiliary lock is 600 ft by 110 ft with a set of miter gates at the upstream and downstream end. Work Statement: The work will consist of furnishing all labor, equipment, operators, supervision, supplies and materials, and incidentals necessary to perform the Melvin Price Locks & Dam Tainter Gate Repairs. The work is anticipated to be accomplished with traditional river marine construction equipment such as floating plant, barge mounted crane, spud barge(s) and staged downstream of Tainter Gates four and five. The structural work on the project includes but is not limited to the following: - Removal and disposal of existing damaged areas and structural steel members on the identified tainter gates. - Preparation and installation of various structural steel members and large skin plate sections via floating plant. Contractor must be able to perform work in accordance with AWS D1.1. - Application of 5-E-Z coating system on repaired areas via floating plant. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Water / Sewer
$5,000,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 5, 2025
To Be Determined, Alton, IL
Related To This Project
Alton, IL
Bid Date: May 06 2025
Alton, IL
Bid Date: May 06 2025
Alton, IL
Bid Date: May 21 2025
Alton, IL
Bid Date: May 21 2025
Alton, IL
Bid Date: Jun 18 2025
Alton, IL
Bid Date: Jun 18 2025
Alton, IL
Bid Date: Jul 02 2025
Alton, IL
Bid Date: Jul 02 2025
Alton, IL
Bid Date: May 01 2025
Alton, IL
Bid Date: May 01 2025
Alton, IL
Bid Date: Apr 17 2025
Alton, IL
Bid Date: Apr 21 2025
Alton, IL
Bid Date: Apr 15 2025
Alton, IL
Bid Date: Apr 02 2025
Alton, IL
Bid Date: Apr 25 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.