Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 28, 2025 at 8:00 PM
Updated April 29, 2025
Demolition, site work and new construction of a mixed-use development in Hepburn, Saskatchewan. Conceptual plans call for the demolition of a elderly care / assisted living facility; for the construction of a elderly care / assisted living facility; for site work for a elderly care / assisted living facility; multi-residential development; multi-residential development; and multi-residential development.
Plans call for a multi-family or seniors assisted living housing on the Heritage Common Events Centre (Previous Bethany College) grounds in Hepburn. 1. Music Wing Parcel This 130' X 130' completely perimeter treed property is available for re-development. There is a 66' X 30' building on this property attached to the Events Centre that is in poor condition and should be demolished leaving the property to be redeveloped. 2. North Court Parcel This 165' X 165" parcel is available for re-development. The L-shaped dorm style building situated on the property is believed able to be re-developed into condos, apartments or assisted senior living units. Building dimensions are 2 - 165'X 50' L shaped wings with a central gathering space. TIMELINE: The owner is seeking proposals from developers. The land is available for sale or long-term lease with the requirement that the re-development must be substantially completed by December 31, 2026 or mutually agreeable time frame. The selected developer would be completely responsible for all costs and aspects of re-development. *Cost is undefined.
Conceptual
Multi-Residential
$5,000,000.00
Public - City
Demolition, New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 17, 2025
703 2nd St E, Hepburn, SK
Related To This Project
Hepburn, SK
Bid Date: Dec 12 2025
Hepburn, SK
Bid Date: Oct 08 2024
Hepburn, SK
Bid Date: Oct 11 2024
Hepburn, SK
Bid Date: Jul 15 2024
Hepburn, SK
Bid Date: Jul 15 2024
Hepburn, SK
Bid Date: May 16 2024
Hepburn, SK
--
Hepburn, SK
--
Hepburn, SK
Bid Date: Mar 03 2022
Hepburn, SK
Bid Date: Oct 11 2022
Battleford, SK
Bid Date: May 02 2025
La Ronge, SK
Bid Date: May 15 2025
Bulyea, SK
Bid Date: May 16 2025
Pilot Butte, SK
Bid Date: May 20 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
