BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 10, 2025 at 8:00 PM

Updated June 11, 2025

Site work, paving and outdoor lighting for a mixed-use development in Williamston, South Carolina. Completed plans call for site work for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; water / sewer project; and for paving for a sidewalk / parking lot.

DESCRIPTION OF WORK The Work may be generally described as the construction of a new asphalt parking lot and new bus loop. This project also includes improvements to the existing storm drainage system; installation of new automatic sliding gates, and site lighting. Work of the Project includes construction of a new parking lot and bus loop. CONTRACT TIME The project is to be substantially complete by January 2, 2026 and achieve Final Completion by February 1, 2026.

Award

Sidewalks / Parking Lot

$1,399,874.00

Public - City

Outdoor Lighting, Paving, Site Work

34

13

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
24
Bidding Soon
1,132
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2025

June 19, 2025

Project location map

702 Belton Hwy, Williamston, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.