Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 12, 2025 at 8:00 PM
Updated August 13, 2025
Site work for a water / sewer project in Bryan, Texas. Completed plans call for site work for a water / sewer project.
Question Deadline 07/02/2025 at 10:00 AM CT Contact Information Catherine Benavides Buyer cbenavides@bryantx.gov The City anticipates the scope of work for the Project to consist of (but not limited to) the following responsibilities and the following items: o Mobilize and perform site and site access improvements as shown on the Drawings and as required for the well driller to access the site and perform the Work. o Drill and test two potable water supply wells, Well 22 and Well 23, each with a 24-inch surface (pump) casing (Base Bid) or a 32-inch surface (pump) casing (Additive Alternate Bid), located at two different sites. Refer to Section 011000 "Summary" and Section 331113 "Potable Water Supply Wells" for detailed work sequence. o Protect the well and cleanup the site as specified in the Contract Documents. o Work must be completed (tested and approved by OWNER and ENGINEER) by September 1, 2026, to meet Brazos Valley Groundwater Conservation District permit requirements. Project Estimated Budget: The proposed estimated budget for construction costs forthis Project is $6,000,000 inclusive of all incidental and contingent expenses associatedwith the construction of the entire scope of the Project. July 1, 2025 - Anticipated Pre-construction Meeting o July 7, 2025 - Anticipated date of Notice to Proceed o September 1, 2026 - Approval of completion and testing of both wells o October 1, 2026 - Completion Date Project Estimated Completion Date: The City has established a target commencement date for construction activities as July 7, 2025. The projected completion date is estimated to be 313 working days. The City reserves the right to modify the commencement date, subject to Owner and Contractor availability, phase the construction of the Project, or modify the schedule as needed and determined by the City due to modifications in scope.
Award
Water / Sewer
$8,358,500.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 10, 2025
August 29, 2025
Multiple Locations, Bryan, TX
Related To This Project
Bryan, TX
Bid Date: Jul 10 2025
Bryan, TX
--
Bryan, TX
--
Bryan, TX
Bid Date: May 20 2025
Bryan, TX
--
Bryan, TX
Bid Date: Apr 25 2025
Bryan, TX
Bid Date: Jun 12 2025
Bryan, TX
Bid Date: Jun 10 2025
Bryan, TX
--
Bryan, TX
Bid Date: Jun 05 2025
Bryan, TX
Bid Date: Apr 29 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
