Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 12, 2025 at 8:00 PM
Updated May 15, 2025
Site work and paving for a road / highway in Nampa, Idaho. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The City of Nampa is seeking qualified and experiencedrespondents from interestedfirms to submit a proposal for providing Project DevelopmentServices for the Can-Ada Roadand Ustick Road Intersection in Nampa, Canyon County. SCOPE OF WORK CAN ADA & USTICK INTERSECTION PWST270002 Background and Project Description The intersection of CAN ADA Road and USTICK Road lies along a major corridor in the City of Nampa and is currently an all-way stop-controlled intersection. CAN ADA Road is a 2-lane road classified as a Collector Road, and USTICK Road is a 2-lane road classified as a Principal Arterial. The purpose of this project is to develop a design for intersection improvements at the CAN ADA Road and USTICK Road intersection. The project will include traffic analysis to determine current and future traffic signal configuration. Design plans for traffic signal, roadway widening, and bridge replacement at Phyllis Canal BK#27510 be developed. The necessary right-of-way will need to be identified. Planning-level costs will be estimated to apply for a FY2027 Strategic Initiative Grant. The following tasks have been developed to complete the intersection design plan and its appurtenances; Awarded Agency will perform all tasks unless otherwise noted. Previous corridor study report was completed on November 29 th of 2022. This study estimated the Life-Cycle Cost of Intersection Designs of the Ustick Corridor. The Consultant will coordinate with City of Nampa and provide the following services to design the intersection including: • Project Administration • Survey • Public Involvement • Environmental • Bridge/Roadway Design • Preliminary Design • Geotechnical Investigation/Design • Utility Coordination & Plans • Final Design • Traffic Control Design • Storm Water Pollution Prevention Plan Design • Plans, Specifications, and Estimate (PS&E)
Post-Bid
Roads / Highways
$500,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 14, 2025
June 13, 2025
Can-Ada Rd & Ustick Rd, Nampa, ID
Related To This Project
Nampa, ID
Bid Date: May 22 2025
Nampa, ID
Bid Date: May 15 2025
Nampa, ID
Bid Date: May 21 2025
Nampa, ID
Bid Date: May 15 2025
Nampa, ID
Bid Date: Jun 20 2025
Nampa, ID
--
Nampa, ID
Bid Date: Apr 18 2025
Nampa, ID
Bid Date: Apr 18 2025
Nampa, ID
--
Nampa, ID
Bid Date: May 06 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
