BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 30, 2025 at 8:00 PM

Updated March 26, 2026

Site work for a water / sewer project in Los Angeles, California. Completed plans call for site work for a water / sewer project.

The CBD Unit 5 project aims to rehabilitate approx. 1,882 linear feet of 44" & 1,081 lf of 45" circular double-brick lined sewer through the ultraviolet Cured-In-Place Pipe (UV-CIPP) lining method. The CBD Unit 6 project aims to rehabilitate approx.1,008 lf of 45", 2,068 lf of 49" circular double-brick lined sewer, & 521 lf of 49" circular doublebrick lined sewer coated with approx. 1" of EcoCast Geopolymer using UV CIPP liner. Project scopes include, but are not limited to: removing fallen bricks & other debris, rehabilitating & increasing the opening size of maintenance holes, constructing temporary access pits, CIPP liner installation, & reinstating house connections. Additionally, sewer bypassing, traffic control & odor control will be implemented during construction. A "Bid Bond" is required. The successful bidder shall provide 2 good & sufficient surety bonds. The "Payment Bond" and "Performance Bond" shall each be for not less than 100% of the contract Price. The Board of Public Works anticipated level of MBE participation is 4%, WBE participation is 2%, SBE participation is 25%, EBE participation is 8%, and DVBE participation is 3% (See Part III of the Proposal). Question Deadline 05/14/2025 Requests for clarification of conflicts and omissions from the contract documents shall be addressed in writing to: Alyssa Reyes Wastewater Conveyance Engineering Division 1149 S. Broadway, Suite 630 Los Angeles, CA 90015 Alyssa.Reyes@lacity.org At the time of bid the contractor must possess a valid State of California Contractors License Classification of A. PROJECT LABOR AGREEMENT This project is subject to the provisions of the Department of Public Works Project Labor Agreement in Part IV of the Bid Proposal. For additional information, contact the Project Manager: Alyssa Reyes, P.E. Wastewater Conveyance Engineering Division 1149 S. Broadway, 6th Floor Los Angeles, CA 90015 E-MAIL: Alyssa.Reyes@lacity.org

Bid Results

Water / Sewer

$24,456,736.00

Public - City

Site Work

173

35

23

5

Subscribe For Documents

66 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2025

August 4, 2025

Project location map

Multiple Locations, Los Angeles, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.