BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 9, 2025 at 8:00 PM

Updated July 10, 2025

Site work for a bridge / tunnel in Milton, Ontario. Completed plans call for site work for a bridge / tunnel.

Conservation Halton is interested in contracting for the following works: Improve access to our pedestrian bridge over CP rail lines at Kelso Conservation Area, Milton. Tenders are invited for all works related to drawings and specifications provided by Red Studio Architects. Conservation Halton intends to issue contract to one entity/general contractor. Question Deadline: Thu May 15, 2025 2:00:00 PM (EDT) Duration in months: 6 All works shall be included as per Drawings and Specifications by Red Studio Architects. Contractor shall also make good all interior/exterior existing abutting surfaces with all necessary trim, caulking, paint, etc. to provide complete finished job. Work of this Contract comprises general construction and interior finishing for a addition to the Existing Visitors Center Building. The project takes place on the grounds of Hilton Fall Conservation Area, located at 4985 Campbellville Rd, Milton, ON L7P 0G3. The project consists of three phases which have been identified on the documents and drawings. The contractor is to provide pricing for all three phases. The tender shall identify the costs of each phase independently to allow the client to determine the extent of the project that will be completed this year. Phase one consists of an interior alteration of existing washrooms and addition to the existing building for a new barrier free washroom. A large new deck with a new roof extension is also part of phase one. Phase two consists of a new addition to the existing building to house new offices. All work associated with completing the addition will form part of phase two. Phase three consists of a new barrier free landscape ramp. The phase pertains to the construction of the ramp along with the preservation of existing trees. The contractor will work closely with Conservation Halton on this phase to ensure and minimize tree damage. .1 Attend a preconstruction meeting with the Conservation Halton to review scope and verify: .1 Exact building dimensions and site location. .2 Finished floor elevations. .3 Verify all current supplied site services meet the requirements of the lease agreement. .4 This must be included in your base bid. .2 Contractor shall coordinate with Conservation Halton's tender documents for division of work. .3 LEED Certification Requirement: None

Award

Bridges / Tunnels

$898,108.00

Public - County

Site Work

41

26

19

5

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
455
Active Projects
166
Bidding Soon
5,091
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2025

June 23, 2025

Project location map

5234 Kelso Rd, Milton, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.