Published July 1, 2025 at 8:00 PM
Updated July 2, 2025
Site work and paving for a transportation facility in Rochester, Minnesota. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.
The City of Rochester is seeking a construction contractor for the Rwy 3/21 Phase 5: Rwy 3 & Twy B Extension & Reconstruction at the Rochester International Airport. Est. Completion Date: Dec. 31, 2026 Description: Major items and approximate quantities on which bids will be received include: Base Bid Schedule 1: Runway 3 & Taxiway B Extension, Reconstruction, & Lighting; FAA LLWAS P-101 Remove, Crush, & Blend Existing Concrete Pavement - 34,600 SY; P-101 Remove, Crush, & Blend Existing Asphalt Pavement - 26,640 SY; P-152 Unclassified Excavation - 110,600 CY; P-152 Borrow Excavation (On Site) - 270,600 CY; P-154 Subbase Course - 87,350 CY; P-156 12" Cement Treated Subgrade (5%) & Geotextile Fabric - 146,100 SY; P-209 Crushed Aggregate Base Course - 38,300 CY; P-401 HMA Asphalt Surface/Base Course - 81,000 TON; P-620 Runway & Taxiway Pavement Marking - 65,000 SF; P-621 Bituminous Pavement Grooving - 54,000 SY; F-162 Chain Link Fence, 8-Foot Height with 5-Strand Barbed Wire - 1,130 LF; D-701 18"-36" Diameter RCP Storm Sewer - 1,350 LF; D-705 6" Perforated PVC Underdrain - 15,200 LF; T-901 Topsoil Respread, Seeding, & Hydromulching - 70 ACRE; L-108 #8 AWG, 5kV, L-824 Electrical Cable - 84,000 LF; L-110 2" Schedule 40 PVC Concrete Encased Electrical Conduit - 37,000 LF; L-125 LED High Intensity Runway Lights with IR Emitters - 104 EA; L-125 LED Medium Intensity Taxiway Edge Lights - 72 EA; L-125 LED Guidance Signs - 18 EA; L-125 LED REILs - 1 SET; L-125 LED PAPIs, 4-Box Set - 2 SET; L-125 Airfield Lighting Control and Management System (ALCMS) - 1 LS; NS-04 FAA LLWAS - 1 LS; NS-07 Furnish & Install Airfield Electrical Vault Backup Generator - 1 LS Base Bid Schedule 2: Runway 3 ILS NS-06 Furnish and Install Runway 3 MALSR System and Shelter - 1 LS; NS-06 Furnish and Install Runway 3 Glideslope Antenna and Shelter - 1 LS; NS-06 Furnish and Install Runway 3 Localizer Antenna and Shelter - 1 LS Alternate Bid: North Runway 21 & Taxiway A/D/E Reconstruction; Taxiway E/F/G Removal; Taxiway A and Ramp Connector Redesignation P-101 Remove, Crush, & Blend Existing Concrete Pavement - 33,600 SY; P-101 Remove, Crush, & Blend Existing Asphalt Pavement - 5,620 SY; P-152 Unclassified Excavation - 107,000 CY; P-154 Subbase Course - 13,300 CY; P-156 12" Cement Treated Subgrade (5%) & Geotextile Fabric - 36,000 SY; P-209 Crushed Aggregate Base Course - 10,200 CY; P-401 HMA Asphalt Base Course - 8,300 TON; P-501 PCC Concrete Pavement - 15 Inch Depth - 20,500 SY; P-620 Runway & Taxiway Pavement Marking - 15,000 SF; D-701 18"-36" Diameter RCP Storm Sewer - 900 LF; D-705 6" Perforated PVC Underdrain - 2,500 LF; T-901 Topsoil Respread, Seeding, & Hydromulching - 27 ACRE; L-108 #8 AWG, 5kV, L-824 Electrical Cable - 26,100 LF; L-110 2" Schedule 40 PVC Concrete Encased Electrical Conduit - 7,000 LF; L-125 LED Medium Intensity Taxiway Edge Lights - 70 EA; L-125 LED Guidance Signs - 7 EA; L-125 Furnish & Install Guidance Sign Panel Replacement - 43 EA PN - A5501-243
Award
Transportation Terminals
$30,200,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.