Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 29, 2025 at 8:00 PM
Updated April 30, 2025
Site work and paving for a bridge / tunnel in Hollis Township, Illinois. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
S.N. 072-3072 was constructed in 1968 and has a Sufficiency Rating of 65.7, which makes it eligible for Federal rehabilitation. The ends of the steel girders are in poor condition due to failed expansion joints. The structure is posted as Legal Load only, which means that no overweight loads are allowed on the structure. This creates difficulties with a nearby generator manufacturer as they move large loads out of their facility. Rehabilitation of the structure is the most cost-efficient way to increase the life of the structure. The project is included in the county's 2025 Capital Improvement Program (CIP). As of April 29, 2025, per owner, project is completed. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Occupancy
Bridges / Tunnels
$4,928,100.00
Public - County
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2024
S Maxwell Rd, Hollis Township, IL
Related To This Project
Hollis Township, IL
--
Hollis Township, IL
Bid Date: Jan 08 2026
Hollis Township, IL
Bid Date: Jan 08 2026
Hollis Township, IL
Bid Date: Jan 08 2026
Hollis Township, IL
Bid Date: Jan 08 2026
Hollis Township, IL
Bid Date: Apr 25 2025
Hollis Township, IL
Bid Date: Jan 07 2025
Hollis Township, IL
Bid Date: Jan 07 2025
Hollis Township, IL
Bid Date: Oct 15 2024
Hollis Township, IL
Bid Date: Oct 15 2024
Hollis Township, IL
Bid Date: Jun 11 2021
Hollis Township, IL
Bid Date: Jan 09 2024
Hollis Township, IL
Bid Date: Jan 09 2024
Hollis Township, IL
Bid Date: Nov 17 2023
Hollis Township, IL
Bid Date: Feb 08 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
