Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 6, 2025 at 7:00 PM
Updated December 19, 2025
Renovation of a clubhouse / community center in Dallas, Texas. Completed plans call for the renovation of a clubhouse / community center.
This is a Request for Information (RFI) and is not a Request for Qualifications/Request for Proposal (RFQ/RFP) or Request for Competitive Sealed Proposal (RFCSP). This request is for information and planning purposes only and shall not be misconstrued as a solicitation or as an obligation on the part of the City of Dallas. The City of Dallas received a grant from the Department of Energy (DOE) for installation of a solar photovoltaic (PV) System to be located at the Martin Luther King, Jr. Community Center located at 2922 Martin Luthor King, Jr. Blvd, Dallas, TX 75215. Questions Due Date: Oct 31st 2025, 12:00 PM CDT Questions regarding this RFI shall be submitted in writing through Bonfire, the City's procurement portal website The City of Dallas invites established and qualified vendor firms to provide turn-key construction services for the installation of rooftop Solar PV on the campus buildings as well as carport solar in the parking lot at Martin Luther King, Jr. Community Center. Vendors should avoid any proprietary or sensitive details when responding to this RFI. Turn-key services should include but not limited to procurement of materials, permitting, installation, interconnection, maintenance, and warranties of Solar PV, controls, data acquisition and commissioning. The proposed project will be funded through a grant award issued by the Department of Energy (DOE). Use of the grant funds requires that the materials/components used in project comply with the BABA act provisions as shown below. Racking systems must be designed to integrate with various roof types, including asphalt shingles, metal roofs, and concrete. The racking system must withstand the weight of the solar panels and environmental loads like wind, snow, and seismic activities. Racking systems must comply with relevant local building codes and UL certifications. All materials/components used in the racking system should be BABA act compliant, if the proposed modules are not BABA act compliant please provide the applicable information in Sections 9, 10, 10.1, 11, 11.1, 11.1.1, 11.1.2, 11.2, 11.2.1, 11.2.2, 11.2.3, 12 & 13 in Attachment C for BABA waiver request form.
Post-Bid
Clubhouse / Community Centers
$100,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 5, 2025
December 22, 2025
2922 Martin Luther King Jr Blvd, Dallas, TX
Related To This Project
Dallas, TX
Bid Date: May 05 2025
Dallas, TX
Bid Date: May 21 2025
Dallas, TX
Bid Date: May 09 2025
Dallas, TX
--
Dallas, TX
Bid Date: May 08 2025
Dallas, TX
--
Dallas, TX
Bid Date: May 06 2025
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
Bid Date: May 02 2025
Dallas, TX
Bid Date: May 05 2025
Dallas, TX
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
