BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 15, 2026

Site work and paving for a mixed-use development in Devils Lake, North Dakota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Proposed Work Consists of 3.1360 Miles of Milling, Hot Mix Asphalt, Shared Use Path, Ada Curb Ramps Located US 2 Frontage, Roads From Nd 19 to Gouldings Rd - Devils Lake And Involves Approximately: 1 L Sum Contract Bond; 52 Sy Removal of Concrete Pavement; 404 Lf Removal of Curb & Gutter; 268 Cy Common Excavationwaste; 502 Ton Aggregate BASE Course Cl 5; 2941 Gal Tack Coat; 56216 Sy Milling Pavement Surface; 1303 Sy Milling Pavement Surface - 4 Inch; 6778 Ton Superpave FAA 43; 407 Ton Pg 58s-34 Asphalt Cement; 1 L Sum Mobilization; 400 Mhr Flagging; 2104 Unit Traffic Control Signs; 6 Ea Type Iii Barricade; 5 Ea Sidewalk Barricade; 125 Lf Pedestrian Channelization; 25 Ea Delineator Drums; 115 Ea Tubular Markers; 5 Ea Temporary Curb Ramp; 1 Ea Bituminous Laboratory; 1 Ea Contractor's Laboratory; 62 Ea Inlet Protection-special; 652 Sy Geosynthetic Material Type G; 3 Ea Adjust Gate Valve Box; 23 Ea Adjust Manhole; 404 Lf Curb & Gutter-type I; 52 Sy Sidewalk Concrete; 68 Sf Detectable Warning Panels. Bid Range $1,000,001 to $1,500,000 Prequalification is required for all bidders submitting a bidding proposal form. Prequalification is required annually. Prequalified contractors who wish to renew their prequalification must submit a complete "Contractor's Prequalification Statement" by July 1 of each calendar year. Bidders who are not currently prequalified must submit a complete "Contractor's Prequalification Statement" at least 10 business days prior to the date of the bid opening. Information is available from the Construction Services Division of the North Dakota Department of Transportation. Contractor's License--A contractor is not required to have a license from the state of North Dakota before bidding on any project, however, no contract will be awarded unless said contractor holds a current North Dakota license in the class within which the value of the contract falls. The right is reserved to reject any and all proposals, to waive technicalities, or to accept such as may be determined to be for the best interests of the state. NDDOT - 24443 - Milling, Hot Mix Asphalt, Shared Use Path, ADA Curb Ramps - US 2 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Roads / Highways

$1,182,203.00

Public - State/Provincial

Paving, Site Work

61

4

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2026

July 7, 2026

Project location map

US-2, Devils Lake, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.